Loading...
SC-Coppell MSW-CS 960726 P.O. Box 478 ~"-"-~ Coppell, Texas 75019 __, The City With A Beautiful Future ~214-462-0022, July 26, 1996 Buddy Echols Coppell Independent School District 200 S. Denton Tap Road Coppell, TX 75019 RE: Coppell Middle School West Development Fee Assessment Dear Mr. Echols: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of thc Development Fee calculations for Coppell Middle School West. Please make payment to the City of Coppell in the amount of $8.325.00 and forward it to Jennifer Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely,~.6x~~'~~ ' Kenneth M. Griffin, P.~. Assistant City Manager/City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official CITY OF COPPELL DEVELOPMENT FEE SUMMARY SHEET Project: Coppell Middle School West Date: July 26, 1996 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact * 1,125.00 1,125.00 Water Tap Inspection * 50.00 paid Water Meter (Domestic) * -0- -0- Water Meter (Irrigation & Fire) * 2,580.90 paid Water Meter Deposit (Non-residential) * -0- -0- Irrigation Meter Deposit * 35.00 paid Wastewater Impact * -0- -0- Wastewater Tap Inspection * -0- -0- Utility Final Inspection * 50.00 paid Park * N/A N/A Roadway Impact 7,200.00 7,200.00 Street Light N/A N/A (Fee @ $292.60 per light. Cannot be assessed until TU Electric submits the lighting plan) Street Sign * N/A N/A Construction Inspection 2,080.00 paid (2 % of project cost due for private improvemems) (4% of project cost due for public improvements) TOTAL $13,120.90 ! ' TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROYAL $ 8,325.00 · See Development Fee Work Sheet or Resolution No. 010996.3 of the Code of Ordinances to determine payment due dates for individual fees. ~_. VF~DPMENT FEE WORK SHEET RE: ~11 ~d~l~ ~'konl ~.)e~']' Date: Water ~pa~: Domestic Mete~ g ~,(inch) = ~ ~U's I~gation Mete~ g ~,(inch) = O ~U's Firel~e Meters g I ~ (inch) = 2,~ ~U's Total ~ ~.~ ~U's ~ ~50.~ ea (1~% due pHor to Council approval of the fi~l P~O Water Tap ~s~ion: Total ff ~ Co~tio~ ~ $50.~ ea pd ~5 ~c~ (Single fami~ due p~or to iss~nce of buiMing pe~it) (All other developmems due p~or to iss~nce of meteO Water M~er ~m~c): Total ~ - ~.(~ch) Domestic Me.rs ~ ea (Single fami~ due p~or to iss~nce of buiMing pe~iO (All ot~r develop~nts due p~or to iss~nce of ~teO Water Meter (krigation/~rel~e): Total g - __.(inch) I~igation Meters ~ 0 Tomlg ~ - ~ (inch) F~lineMeters~ ~~ Total $ ~{~O ~ ~d B~ ~4~~ (1~ due p~or to iss~nce of water ~ters) Water Meter ~sit ~ulti-f~iy or Non-r~idenfi~): Total g O Meters ~ $30.~ ea (1~ due p~or to iss~nce of water meters) ~gation/~e Meter ~it: Total ~ I Mete~ ~ $35.~ ea ~ ~ eo~~ (1~ due p~or to iss~nce of water meters) W~ewater ~pact: Total Domestic Memrs ~U's - ~ ~ ~50.ffi ea (1~ due p~or to Council approval of the fi~l P~O W~ewater Tap ~s~ion: Total g ~ Co~ectio~ ~ $50.~ ea (1~ due p~or to iss~ce of building pe~iO UtiH~ ~ ~ion (~1 development): Total g I ~m ~ $50.~ ea ~ ¢~ e~4~c~ (1~ due p~or to iss~ce of buiMing pe~iO ~ '~ ~'~ Page ! of 2 Park: · Peliminary plat approval prior to June 23, 1992: # Residential lots @ $150.00 ca # Units (multi-family) @ $75.00 ea (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) · Preliminary plat approval after June 23, 1992: # Residential lots @ $350.00 ea # Units (multi-family) @ $350.00 ea (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) , Preliminary plat approval after October 26, 1993: # Residential lots @ $1,285.00 ea # Units (multi-family) @ $1,285.00 ea (100% paid prior to Council approval of final plat) Roadway Impact: Separate fee calculations attached. Street Lighting: Fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of project) Street Signs: Separate Street Sign Assessment form will be provided. (100% due prior to final acceptance of project) Construction Inspection: Copy of contract must be submitted for assessment (2% of project cost due for private improvements) (4% of project cost due for public improvements) Page 2 of 2 ROADWAY IMPACT FEE CALCULA'~ sONS PROJECT: Coppell Middle School West DATE: 7/26/96 ROADWAY IMPACT FF, F,: Service Area * 10 Category ** Institutional Land Use ** Coppell Middle School West Maximum Number of Students' 300 Development Units (# of students) ** 300 Vehicle Miles per Development Unit ** 0.08 Fee per Vehicle Mile $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $7,200.00 · (Figure 2 - Roadway Impact Fee Study) · * (Table 3 - Roadway Impact Fee Study)