Loading...
SC-Cottonwood E9-CS 950918 Coppell, Texas 75019 Citv WithABeautiful Future 214-462-0022 September 18, 1995 Mr. David Lippert Calhar Construction Co., Inc 401 S. Sherman,//309 Richardson, Texas 75081 RE: Cottonwood Creek Elementary School Dear Mr. Lippert: In accordance with your request, inspection service was provided by the City of Coppell Engineering Departmem at the referenced location on Saturday, September 16, 1995. The overtime rate including salary and benefits is $30.00 per hour. Two hours were charged to your company on that date. Please send a check for $60.00 payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Alan Johnson, Finance Director If you should have any questions, please contact me at (214) 304-3685. Construction Inspector cc: Doug Stevens, Engineering Technician Finance Department file/ovt, ltr