Loading...
SC-Cottonwood E9-CS 950417,-~-r--- P.O. Box 478 ~-------'~--. ':" ' ~ Coppe,l. Texas 75049 ~ '--~'J 214-462-0022 P.O. Box 478 -~ Coppell. Texas 750~ 9 April 17, 1995 Robert Howman Glenn Engineering 3705 Ridgewood Drive Grand Prairie, Texas 75052 RE: Cottonwood Creek Elementary Development Fee Assessment Dear Robert Howman: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for the Cottonwood Creek Elementary Please make payment to the City of Coppell in the amount of $22.725.00 and forward it to Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Asst. City Manager/City Engineer cc: Alan Johnson, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Howard Pafford, Utilities Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager CITY OF COPPELL DEVELOPMENT FEES Date: April 7, 1995 Project: Cottonwood Creek Elementary TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee 15,525.00 15,525.00 (100% due prior to Council Approval) Water Tap Inspection Fee 400.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee 7,200.00 7,200.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee N/A (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 885.00 (100% due at Issuance of Water Meter) Water Meter Deposit 70.00 (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) 1,672.80 (100% due at Issuance of Water Meters) Irrigation Meter Deposit 70.00 (100% due at Issuance of Water Meters) Street Sign Fee N/A (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Acceptance of Project) available Park Fee N/A (50% due prior to Council Approval) (50% due prior to Issuance of Building Permit) Street Escrow N/A (100% due prior to Council Approval) Construction Inspection Fee need submittal of (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $25,872.80 $22,725.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL ENGINEERING MEMORANDUM DATE: 4/5/95 TO: Mike Martin, E.I.T. FROM: Howard Pafford, Utilities Superintendent RE: Development Fees for Cottonwood Creek Elementary The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 1 - 3" Domestic Meter/s = 16 ESU's 2 - 2" Irrigation Meter/s = 16 ESU's 1 - 8" Fireline Meter/s = 2.5 ESU's Total 34.5 ESU's @ $450.00 ea = $15,525.00 100% due prior to Council approval of the final plat. Wastewater Impact 1 - 3" Domestic Meter/s = 16 ESU's Total 16 ESU's @ $450.00 ea = $7,200.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 4 Connections @ $100.00 each = $400.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots @ $50.00/lot = $50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - 3" Domestic Meters @ 885.00ea = $885.00 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 2 - 2" Irrigation Meter/s @ $173.65 ea = $347.30 1 - 8" Fireline Meter/s ~ $ $1.325.50ea = $1.325.50 TOTAL $ 1.672.80 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Non-Residential) 2 Meters @ $35.00 ea = $70.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 2 Meters @ $35.00 ea = $70.00 100% due prior to issuance of water meters.