Loading...
SC-Coppell HS-CS 880107817 336-5773 TEAGUE NALL AND PERKINS C 0 N S U L T I N G E N G i N E E R S January 7, 1988 Mr. Steve Morton Chief, Land Developments City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: New Coppell High School Erosion Protection Dear Steve: Please find enclosed copies of the proposed erosion protection for (1) the outfall of the 60" RCP north of the school site to the existing creek; (2) the temporary transition from the existing drainage ditch south of the school property into the concrete box culvert. We will wait for approval from you before authorizing the contractor to begin construction on any of these improvements. Your expeditious response to this matter is greatly appreciated. Sincerely, TEAGUE NALL ~ERKINS, S. Tom Rutledge INC. STR/ll Enclosure CC: Mike Elmore, SHWC, Inc. Jerry Conatser 915 Florence Street Fort Worth, Texas 76102 TEAGUE NALL AND PE"'XlNS, INC. Consulting Engin~;s 915 Florence Street FORT WORTH, TEXAS 76102 (817) 336-5773 SHEET NO "-J OF CALCULATED DY ~ DATE CHECKED BY DATE / -o 74:g' i i TEAGUE NALL AND PErX"NS, INC. Consulting Engine_; 915 Florence Street FORT WORTH, TEXAS 76:[02 (817) 336*5773 SHEET NO ~ OF CALCULATED BY DATE I