SC-Coppell HS-CS 880107817 336-5773
TEAGUE NALL AND PERKINS
C 0 N S U L T I N G E N G i N E E R S
January 7, 1988
Mr. Steve Morton
Chief, Land Developments
City of Coppell
P.O. Box 478
Coppell, Texas 75019
Re:
New Coppell High School
Erosion Protection
Dear Steve:
Please find enclosed copies of the proposed erosion protection
for (1) the outfall of the 60" RCP north of the school site to
the existing creek; (2) the temporary transition from the
existing drainage ditch south of the school property into the
concrete box culvert.
We will wait for approval from you before authorizing the
contractor to begin construction on any of these improvements.
Your expeditious response to this matter is greatly
appreciated.
Sincerely,
TEAGUE NALL ~ERKINS,
S. Tom Rutledge
INC.
STR/ll
Enclosure
CC:
Mike Elmore, SHWC, Inc.
Jerry Conatser
915 Florence Street Fort Worth, Texas 76102
TEAGUE NALL AND PE"'XlNS, INC.
Consulting Engin~;s
915 Florence Street
FORT WORTH, TEXAS 76102
(817) 336-5773
SHEET NO "-J OF
CALCULATED DY ~ DATE
CHECKED BY
DATE
/ -o 74:g'
i i
TEAGUE NALL AND PErX"NS, INC.
Consulting Engine_;
915 Florence Street
FORT WORTH, TEXAS 76:[02
(817) 336*5773
SHEET NO ~ OF
CALCULATED BY DATE
I