ST9602-CS000428pb Parsons CMAQ Program Office Brinckerhoff 170 1 N. Market Street Suite 4 10 I00 ~s Dallas, TX 75202 214-747-6336 Fax.' 214-741-1937 E-mail: cmaq@onramp,net April 28, 2000 Mr. Ken Griffin, P.E. City of Coppell 255 Parkway Blvd. Coppell, Texas 75225 Subject: Congestion Mitigation Air Quality (CMAQ) Program Final Review (100%) For Project 10 Dear Mr. Griffin: Attached please find the final submittal by USA Professional Services Group, Inc. for CMAQ Project 10. Please review this set of documents for errors and omissions, bidability and buildability only. New design requirements are not appropriate at this stage. Submit any comments on the normal review form. Comments should be returned no later than May 22, 2000. On the notification that plans are complete, we will request sealed mylars from USA Professional Services Group, Inc. and begin the process of obtaining the "Title Sheet" signatures from the CMAQ Program partners. If you have any questions regarding the provided materials, please contact me at 747-6336 ext. 26 or Jack Loggins at ext. 28. Sincerely, Ivan F. Nicodemus, P.E. Program Manager Attachments: (1 .)Dispositioned 95% Review Comments (2 copies) (2.)Final Plans, 1 lx17 Paper (2 copies) (3.) Engineers Estimate, (2 copies) (4.)Contract Time Estimate (2 copies) (5.)Table of Equals (2 copies cc: Don L. Cranford, P.E., Dallas County, Asst. Dir., Transp. & Plan., w/o attachments Moosa Saghian, P.E., Texas Department of Transportation, w/o attachments Suja Matthew, P.E., Texas Department of Transportation, w/o attachments Maher Ghanayem, P.E., Texas Department of Transportation, w/o attachments Scott Young, P.E., USA Professional Services Group, Inc., w/o attachments Over a Century of \\CMAQ\GENERAL\G04CORR\G4-10UT~COPPELL~000~326_P10 Review 100% .doc Engineering Excellence _- ,, c-jTq6c % Parsons CMAQ Program Office Brinckerhoff 170 1 N. Market Street PB Suite 410 !00 Dallas, TX 75202 YEARS - 214-747-6336 Fax: 214-741-1937 E-maih cmaq~onramp. net April 28, 2000 Moosa Saghian, P.E. Texas Department of Transportation PO Box 3067 Dallas, Texas 75202 Subject: Congestion Mitigation Air Quality (CMAQ) Program Final Review (100%) For Project 10 Dear Mr. Saghian: Attached please find the final submittal by USA Professional Services Group, Inc. for CMAQ Project 10. Please review this set of documents for errors and omissions, bidability and buildability only. New design requirements are not appropriate at this stage. Submit any comments no later than May 22, 2000. On the notification that plans are complete, we will request sealed mylars from USA Professional Services Group, Inc. and begin the process of obtaining the "Title Sheet" signatures from the CMAQ Program partners. If you have any questions regarding the provided materials, please contact me at 747-6336 exto 26 or Jack Loggins at ext. 28° Sincerely, Ivan F. Nicodemus, P.E. Program Manager Attachments: (1 ,)Dispositioned 95% Review Comments (4 copies) (2.) Final Plans, 1 lx17 Paper (4 copies) (3.) Engineers Estimate, (4 copies) (4.) Contract Time Estimate (4 copies) (5.)Table of Equals (4 copies cc: Don L. Cranford, P.E., Dallas County, Asst. Dir., Transp. & Plan., w/o attachments Suja Matthew, P.E., Texas Department of Transportation, w/o attachments Maher Ghanayem, P.E., Texas Department of Transportation, w/o attachments Ken Griffin, P.E., City of Coppell, w/o attachments Scott Young, P.E., USA Professional Services Group, Inc., w/o attachments Over a Century of G :\G04CORR\G4-10U~TXDO'R2000\714 P 10 Review 100%. doc Engineering Excellence DESIGN REVIEW COMMENTS DALLAS COUNTY CMAQ PROGRAM Project:: CMAQ Project 10 Submittal: 95% Review Date: December 6, 1999 } Sheet: 1 ~ of 11 Reviewer: Dispositioned Organization: PM/E Reviewer Telephone Number: (214) 747-6336 x 28 Item ~ Page No. ~ Comment - (state fully action required, i.e., clarify, Response Action No. Sheet No. change, add, delete, etc. 1. Estimate Two months does not seem enough for this project. Verify. A Resolve with Mandy Vassigh, TxDOT (972) 235-7797 2. Estimate Item 668-5070 Has wrong description and Item number, A should be 666-5044. Verify and modify. Resolve with Mandy Vassigh, TxDOT (972) 235-7797 3. Estimate Description code for Item 104, REMOVE CONC (DRVWY) is A 5011. Modify Resolve with Mandy Vassigh, :I'xDOT (972) 235-7797 4. Estimate Description code for Item 160 is 5024. Modify A Resolve with Mandy Vassigh, TxDOT (972) 235-7797 5. Estimate Description code for TY H Inlet is 5002. Modify A Resolve with Mandy Vassigh, TxDOT (972) 235-7797 "' 6. Estimate Description code for Item 529 is 5002. Modify .! A Resolve with Mandy Vassigh, TxDOT (972) 235-7797 7. Estimate The last description code under Item 678, is 5026. Modify. Will use correct code for RR markings A Resolve with Mandy Vassigh, TxDOT (972) 235-7797 8. General All standards other than TxDOT standards must be sealed A Comment and signed. Resolve with Gazi Sharif, TxDOT 214-320-4414 9. General Provide construction time calculations. (Consolidated A Comment Comment # 25). Resolve with Gazi Sharif, TxDOT 214-320-4414 10. Index Of Delete CPCR(1)-95(M) and CPCD -(95) standards. We are A Sheets not using them in this set of plans. (Consolidated Comment # Sheet 2 47). Resolve with Gazi Sharif, TxDOT 214-320-4414 11. Summary We suggest that the columns without quantities be deleted A Sheets from the summary tables. Resolve with Mandy Vassigh, TxDOT (972) 235-7797 12. TCP- Gen We recommend arrow panels when dropping a lane for better Will change to arrow panels A Comment visibility and added safety. (Consolidated Comment # 22). Resolve with Gazi Sharif, TxDOT 214-320-4414 v Action Codes Dispositioned By: __Scott Young A - Agree, Designer will comply D - Delete, Reviewer Withdraws Comment Title: C - Disagree, Designer and E - Exception, Resolution Required Date: Reviewer Resolution Required N/A - Not Applicable ~.1/18~2000 F:\projects\P09Pre-Final\P9-4REV~P10\Dispositioned\P10 Consolidated W Coppell.doc DESIGN REVIEW COMMENTS DALLAS COUNTY CMAQ PROGRAM Project:: CMAQ Project 10 Submittal: 95% Review Date: December6, 1999 ~ Sheet: 2 ~ of 11 Reviewer: Dispositioned Organization: PM/E Reviewer Telephone Number: (214) 747-6336 x 28 Item J Page No. J Comment - (state fully action required, i.e., clarify, Response Action No. Sheet No. change, add, delete, etc. 13. TCPGeneral Need to show the construction pavement markings. Will change to show temporary construction A Comment (Consolidated Comment # 23). pavement markings if applicable. Where possible Resolve withGaziSharif, TxDOT214-320-4414 we will install permanent markings at earliest possible time. 14. TCP Plans Change all the BC (1-9C)-98(M) according to comment #3. Will break out all the 98 and 98 separately A Resolve with Mandy Vassigh, TxDOT (972) 235-7797 15. Title Sheet Latest BC Standard sheets are BC (1 - 9C)- 98(M). Modify. See Comment #14 A (Consolidated Comment # 72). Resolve with Gazi Sharif, TxDOT 214-320-4414 16. Typical Show stations. A Section - Gen Resolve with Gazi Sharif, TxDOT 214-320-4414 Comment .-' · 17. Quantity Follow same order as the Index of Sheets (Denton @... first A Summary then MacArthur @... second). Sheets (3-4) Resolve with Gazi Sharif, TxDOT 214-320-4414 18. I Show CSJ with Federal aid Project number. A Resolve with Mandy Vassigh, TxDOT (972) 235-7797 19. I Delete the signature block for Special Project Office A manager. Resolve with Mandy Vassigh, TxDOT (972) 235-7797 20. 1 Change BC (1-10)-97M to BC (2-8)-98 M, See Comment #14 A BC (1)-99 (M), BC (9-9A)-99(M), and BC (9B-9C)-9a(M). Resolve with Mandy Vassigh, TxDOT (972) 235-7797 21. 1 Federal Aid Project Number in the title block does not match A the one on the sheet. Resolve with Mandy Vassigh, TxDOT (972) 235-7797 22. I We do not need city of Coppell project number. A Resolve with Gazi Sharif, TxDOT 214-320-4414 23. 1 Add C.S.J and length to each intersection in Km. A Resolve with Gazi Sharif, TxDOT 214-320-4414 24. I Use TxDOT logo for copyright. A v Action Codes Dispositioned By: __Scott Young. A - Agree, Designer will comply D - Delete, Reviewer Withdraws Comment Title: C - Disagree, Designer and E - Exception, Resolution Required Date: Reviewer Resolution Required N/A- Not Applicable 1/18/2000 , F:\projects\P09Pre-Final\P9-4REV~P10\Dispositioned\P10 Consolidated W Coppell.doc DESIGN REVIEW COMMENTS DALLAS COUNTY CMAQ PROGRAM Project:: CMAQ Project 10 Submittal: 95% Review Date: December 6, 1999 ~ Sheet: 3 ~ of 11 Reviewer: Dispositioned Organization: PM/E Reviewer Telephone Number: (214) 747-6336 x 28 Item Page No. Comment - (state fully action required, i.e., clarify, Response Action No. Sheet No. change, add, delete, etc. Resolve with Gazi Sharif, TxDOT 214-320-4414 25. I Delete the signature block of the manager of special project A office. Revise the copyright notation year to 2000. Resolve with Gazi Sharif, TxDOT 214-320-4414 26. 2 Standard sheets missing from the plans. PM will provide the mylars with the final PS&E A Resolve with Mandy Vassigh, TxDOT (972) 235-7797 27. 2 'List Bc standards as noted in comment # 20. See comment #14 A Resolve with Mandy Vassigh, TxDOT (972) 235-7797 28. 2 Change RCAWSS-96 (M) to 98(M) A Resolve with Mandy Vassigh, TxDOT (972) 235-7797 29. 2 Change RCSS-95 (M) to 98(M). A Resolve with Mandy Vassigh, TxDOT (972) 235-7797 r.. 30. 2 Change WZ (BTS-1, 2-98(m) TO 99(M). -: A Resolve with Mandy Vassigh, TxDOT (972) 235-7797 31. 2 List the RPM and PM standards separately and change RPM A from 95A to 92(M). Resolve with Mandy Vassigh, TxDOT (972) 235-7797 32. 2 Quantity summary sheet is different from the estimate A quantity sheet. Include one sheet for the Estimate and quantity sheet and 2 sheets for general notes and specification data. Our Austin office will add those three sheets. Include those sheets after the sheet no: 2. Resolve with Gazi Sharif, TxDOT 214-320-4414 33. 2 SW3P sheets are part of construction plans and must be Sheet number 5 is the SW3P, will put a title on the A included. Each intersection must have their own SW3P sheet. sheet or include both intersections in the same sheets and ~ut it under general. (Consolidated Comment # 48). Resolve with Gazi Sharif, TxDOT 214-320-4414 34. 2 Move sheets 6-7 and list under their own intersection. A Resolve with Gazi Sharif, TxDOT 214-320-4414 35. 2 Use same intersection name (MacARHTUR @... ) ~ A Resolve with Gazi Sharif, TxDOT 214-320-4414 v Action Codes Dispositioned By: __Scott Young A - Agree, Designer will comply D -.Delete, Reviewer Withdraws Comment Title: C - Disagree, Designer and E - Exception, Resolution Required Date: Reviewer Resolution Required N/A - Not Applicable __1/18/2000 F:\projects\P09Pre-Final\P9-4REV~P10\Dispositioned\P10 Consolidated W Coppell.doc DESIGN REVIEW COMMENTS DALLAS COUNTY CMAQ PROGRAM Project:: CMAQ Project 10 Submittal: 95% Review Date: December 6, 1999 ~ Sheet: 4 [ of 11 Reviewer: Dis~ositioned Organization: PM/E Reviewer Telephone Number: (214) 747-6336 x 28 Item Page No. [Comment - (state fully action required, i.e., clarify, Response Action No. Sheet No. change, add, delete, etc. 36. 2 Sheets 57-61- List all standards. Will place a description on this sheets. Will include A Resolve with Gazi Sh~irif, TxDOT 214-320-4414 page number for std. sheets. 37. 2 Separate state, district, and city standards. Leave all city A standards under miscellaneous details, Resolve with Gazi Sharif, TxDOT 214-320-4414 38. 2 Sheet 16- misspelled word. A Resolve with Gazi Sharif, TxDOT 214-320-4414 ) 39. 2 A. Delete "W (1)-95(M)" standard from the list. A B. Add LDI-98 (M) and Signs (Dallas) to the list. C. For all title block, Highway No. Should be CS. Resolve With Jahor Roy, TxDOT 214-319-6405 40. 3 Provide sheet numbers and sheet number ranges in the A &4 "Sheet Number" column. Resolve with Jack Loggins PME 214-747-6336 x 28 41. 3 Provide quantity tables on the paving plan sheet. A -4 Resolve with Gazi Sharif, TxDOT 214-320-4414 42. 3 Items, which are not part of this project, must be deleted. A -4 Resolve with Gazi Sharif, TxDOT 214-320-4414 43. 3 Brick pavers are paid 100% by the city. A subtitle must be Already there, see sheet #3 A -4 included for that. Resolve with Gazi Sharif, TxDOT 214-320-4414 44. 3 Modify curb and gutter to mono curb in the summery sheet. A -4 Resolve with Gazi Sharif, TxDOT 214-320-4414 ) 45. 3 Item # 678 REFL PAV MRK TY I (W) (600), AND TY-II (W) Will correct to match. A -4 (600) total does not match with sheet #32. (To verify with city on use of buttons or RPM) Resolve with Gazi Sharif, TxDOT 214-320-4414 46. 3 Item # 666 PVMT SURF PREP MRKG (600) total does not Will correct to match. A -4 match with sheet #32. (To verify with city on use of buttons or RPM) Resolve with Gazi Sharif, TxDOT 214-320-4414 47. 3 A. Delete 'Zero' quantity items from the summary tables. A. Will correct A-A &4 B. Foundation for 600mm and 750mm should be 1.7M and B. Will correct B-A 3.4M, respectively. C. Not part of contract, PME deleted C-D v Action Codes Dispositioned By: _Scott Young. A - Agree, Designer will comply · D - Delete, Reviewer Withdraws Comment Title: C - Disagree, Designer and E - Exception, Resolution Required Date: Reviewer Resolution Required N/A - Not Applicable __ 1/18/2000 F:\projects\P09Pre-Final\P9-4REV~P10\Dispositioned\P10 Consolidated W Coppell.doc DESIGN REVIEW COMMENTS DALLAS COUNTY CMAQ PROGRAM Project:: CMAQ Project 10 Submittal: 95% Review · Date: December 6, 1999 I Sheet: 5 I of 11 Reviewer: Dispositioned Organization: PM/E Reviewer Telephone Number: (214) 747-6336 x 28 Item Page No. Comment - (state fully action required, i.e., clarify, Response Action No. Sheet No. change, add, delete, etc. C. Provide cost break down for item 680 in a spreadsheet. D. Not part of contract, PME deleted C-D D. Provide estimated cost of "Ped Elements" in a separate sheet. Resolve with Jahor Roy, TxDOT 214-319-6405 48. 5 Sheet #5 is SW3P. A Resolve with Gazi Sharif, TxDOT 214-320-4414 49. 6 Berm at 2% slope must be provided behind the curb. A ) (Consolidated Comment # 89). Resolve with Gazi Sharif, TxDOT 214-320-4414 50. 6 Add Note: For Sawcut details see sheet xx. (Consolidated See note.2 on this sheet A Comment # 124). Resolve with Gazi Sharif, TxDOT 214-320-4414 ; .. 51. 7 Show the sidewalk. If no sidewalk, use berm with 2% s!Ope. There is no sidewalk in the median area where the A (Consolidated Comment # 119). modification is taking place. Resolve with Gazi Sharif, TxDOT 214-320-4414 52. 7 Show topsoil, block sod, and the type of the curb on the A typical section. (Consolidated Comment # 120). Resolve with Gazi Sharif, TxDOT 214-320-4414 53. 7 Add 'MOD" to CPCD in the typical section. (Consolidated A Comment# 121). Resolve with Gazi Sharif, TxDOT 214-320-4414 54. 11 Text size is too small and is illegible. Details are difficult to This is a City of Coppell standard. Will try to A -12 read. Delete the details, which are not applicable to the increase the text size. ) project. Resolve with Gazi Sharif, TxDOT 214-320-4414 55. 13 It appears details included are more than what you are using This is a TxDOT standard and will be placed to the A -14 in your project. If it is not applicable to your project remove appropriate location. those details. All Dallas District Standards must be listed under that. Resolve with Gazi Sharif, TxDOT 214-320-4414 56. 15 This sheet is a state standard and must be listed under that. A Resolve with Gazi Sharif, TxDOT 214-320-4414 v Action Codes Dispositioned By: _Scott Young, A - Agree, Designer will comply D - Delete, Reviewer Withdraws Comment Title: C - Disagree, Designer and E - Exception, Resolution Required Date: Reviewer Resolution Required N/A - Not Applicable 1118/2000 F:\projects\P09Pre-Final\P9-4REV~P10\Dispositioned\P10 Consolidated W Coppell.doc DESIGN REVIEW COMMENTS DALLAS COUNTY CMAQ PROGRAM Project:: CMAQ Project 10 Submittal: 95% Review Date: December 6, 1999 [ Sheet: 6 ~ of 11 Reviewer: Dispositioned Organization: PM/E Reviewer Telephone Number: (214) 747-6336 x 28 Item Page No. Comment - (state fully action required, i.e., clarify, Response Action No. Sheet No. change, add, delete, etc. 57. 16 Existing and proposed ground must be included in all storm The existing and proposed ground will be shown. A sewer profile sheets. Also, if the depth of cut is more than 4 The depth is less than 4 m, therefore no trench m (read spec), need to provide trench excavation protection excavation is required. and that is a separate pay item. Sewer excavation quantity must be included and is a subsidiary pay item. Resolve with Gazi Sharif, TxDOT 214-320-4414 58. 17 Federal aid Project Number in the title block is wrong. Modify. Will correct A Resolve with Mandy Vassigh, TxDOT (972) 235-7797 59. 20 The legend shows CPCD or CPCD (MOD), use CPCD A (MOD) only. Resolve with Gazi Sharif, TxDOT 214-320-4414 60. 20 Add note: Details for 'X' are shown in sheet xx. (Consolidate.d A Comment # 101). Resolve with Gazi Sharif, TxDOT 214-320-4414 61. 20 Provide sheet number for note # 6. A Resolve with Jack Loggins PME 214-747-6336 x 28 62. 20 Show the telephone line (that is shown in Drainage details) in A the plan view. Need to show any utilities in the construction area so that the utility companies can be contacted for possible relocation. (Consolidated Comment # 84). Resolve with Gazi Sharif, TxDOT 214-320-4414 63. 20 CTR 9+979 at both sides of the driveway, lead lines are not A pointing to any curve. Modify. (Consolidated Comment # 106). Resolve with Gazi Sharif, TxDOT 214-320-4414 64. 20 Provide station, offset for the saw cut intersection point either Station callout will be corrected A on the paving plan sheets or in the intersection layout. (Consolidated Comment # 108). Resolve with Gazi Sharif, TxDQT 214-320-4414 65. 20 Label all driveway and street radius. (Consolidated Comment A # 55). Resolve with Gazi Sharif, TxDOT 214-320-4414 v Action Codes Dispositioned By: SCott Young A - Agree, Designer will comply D - Delete, Reviewer Withdraws Comment Title: ' C - Disagree, Designer and E - Exception, Resolution Required Date: Reviewer Resolution Required N/A - Not Applicable 1/18/2000 F:\projects\P09Pre-Final\P9-4REV~P10\Dispositioned\P10 Consolidated W Coppell.doc DESIGN REV,r:W COMMENTS DALLAS COUNTY CMAQ PROGRAM Project:: CMAQ Project 10 Submittal: 95% Review Date: December6, 1999 ~ Sheet: 7 ~ of 11 Reviewer: Dispositioned Organization: PM/E Reviewer Telephone Number: (214) 747-6336 x 28 Item [ Page No. ~ Comment - (state fully action required, i.e., clarify, Response Action No. Sheet No. change, add, delete, etc. 66. 20 Label end construction station. A Resolve with Gazi Sharif, TxDOT 214-320-4414 67. 20, Paving Quantities Table is missing from this sheet. A 28 Resolve with Gazi Sharif, TxDOT 214-320-4414 68. 20, ADA ramp is not included. Label location also. (Consolidated Laydown curb will be installed on sheet 20 A 28 Comment # 111 ). Resolve with Gazi Sharif, TxDOT 214-320-4414 ) 69. 21 Distinguish between existing and proposed signal heads and A. Will correct A-A signal poles. B. Will review, existing detectors are in pavestone B-A Striping and detectors overlap into pave-stone crosswalk as shown, proposed detectors will be C-A areas. Correct. positioned to correct position to detect vehicle. --- Show ROW lines. D-A P-1 & P-3 are very close to curbs. Vedfy and correct ii To be discussed with city. shown incorrectly. "" C. Will show D. Will verify and correct if needed 70. 2t Note 1, new foundation for pole P-3 should be P-2. Will correct A Resolve with Jahor Roy, TxDOT 214-319-6405 71. 21 Delete note 8. It is paid for under 'Salvaging Traffic Signals'. Will delete A Resolve with Jahor Roy, TxDQT 214-319-6405 72. 21 Foundation for 750mm should be 3.4M instead of 3.1M. Witl correct A Resolve with Jahor Roy, TxDOT 214-319-6405 73. 21, ROW is missing; See comment #69c A 23,30&32 Resolve with Jahor Roy, TxDOT 214-319-6405 74. 22 In conduit Runs chart, No. 6 bare is already in existing run Will correct A ) #1,4,5,6 & 8. We do not need new #6 bare, unless we replace all. Resolve with Jahor Roy, TxDOT 214-319-6405 75. 22 In conduit Runs chart, No. 6 bare is already in existing run #1 Will correct A - 3 We do not need new #6 bare, unless we replace all. Resolve with Jahor Roy, TxDOT 214-319-6405 76. 23 Show approximate station for begin and end of pavement Will show A markings. (Consolidated Comment # 65): v Action Codes Dispositioned By: __Scott Young. A - Agree, Designer will comply D - Delete, Reviewer Withdraws Comment Title: C - Disagree, Designer and E - Exception, Resolution Required Date: Reviewer Resolution Required N/A - Not Applicable 1/18~2000 F:\projects\P09Pre-Final\P9-4REV~P10\Dispositioned\P10 Consolidated W Coppell.doc DESIGN REVIEW COMMENTS DALLAS COUNTY CMAQ PROGRAM Project:: CMAQ Project 10 Submittal: 95% Review Date: December 6, 1999 ~ Sheet: 8 ~ of 11 Reviewer: Dispositioned Organization: PM/E Reviewer Telephone Number: (214) 747-6336 x 28 Item Page No. Comment - (state fully action required, i.e., clarify, Response Action No. Sheet N0. change, add, delete, etc. Resolve with Gazi Sharif, TxDOT 214-320-4414 77. 23 A. Show existing arid proposed stop bars. A. Have shown. Will change line weight to reflect A-A B. Proposed striping goes into crosswalk areas. Correct. existing and proposed B-A C. Show pave-stone crosswalks as reference. B. See comment #-69B C-A D. Add RLMTR sign near stop bar. E. Add Arrow at beginning, ONLY at middle, and arrow at C. Have shown on plans. Will change line weight D-A end of right turn lane pavement markings. D- Will add E_A F. The right turn lane line markings should include reflective E. Will add F-A buttons. F. Will add Resolve with Jack Loggins PME 214-747-6336 x 28 78. Pavement A. We assume that Coppell uses only buttons for lane lines. A. Will verify and correct if necessary A-A Markings Verify. If this is not correct, change to thermo-plastic with B. Will change line weight B-A a reflective button in the gap. B. Distinguish between existing and proposed pave~hent C. Will add C-A markings. C. Add call-outs for reflective buttons. Resolve with Jack Loggins PME 214-747-6336 x 28 79. 23 Use 3 "R3-5R~ signs per approach. On approaches under construction A Resolve with Jahor Roy, TxDOT 214-319-6405 80. 24 If you meant vertical panel, label that way and add the Will label and add to legend per TxDOT std. A TxDOT legend. That legend is available in the sign cell library. We suggest using vertical panel on the other intersection also. Resolve with Gazi Sharif, TxDOT 214-320-4414 81. 24 What is the existing width at section B-B? Could not verify Will verify width of two lanes with panels will provide A whether this section matches the width on the plan view at adequate distance for traffic and buffer between the same location. Look more closely at this location to meet traffic and panels minimum buffer requirements. Resolve with Gazi Sharif, TxDOT 214-320-4414 82. 25 Delete traffic signal from the traffic control sheet and add that Will remove from TCP A information on the signal sheet. Resolve with Gazi Sharif, TxDOT 214-320-4414 v Action Codes Dispositioned By: __Scott Young A - Agree. Designer will comply D - Delete, Reviewer Withdraws Comment Title: C - Disagree, Designer and E ~ Exception, Resolution Required Date: Reviewer Resolution Required N/A - Not Applicable 1/18/2000 F:\projects\P09Pre-Final\P9-4REV~P10\Dispositioned\P10 Consolidated W Coppell.doc DESIGN REv,,':W COMMENTS DALLAS COUNTY CMAQ PROGRAM Project:: CMAQ Project 10 Submittal: 95% Review Date: December 6, 1999 ~ Sheet: 9 e of'l 1 Reviewer: Dispositioned Organization: PM/E Reviewer Telephone Number: (214) 747-6336 x 28 Item Page No. ~ Comment - (state fully action required, i.e., clarify, Response Action No. Sheet No. change, add, delete, etc. 83. 25 Diagonal lines on striped median on south leg are slanted the Will verify in field and correct if necessary. These A wrong way. are existing. Resolve with Jack Loggins PME 214-747-6336 x 28 84. 25 Railroad construction signs and markings must be included. Will include A (Consolidated Comment # 28). Resolve with Gazi Sharif, TxDOT 214-320-4414 85. 25 Section A-A- Numbers on this section does not add up. Will verify and correct A Modify. Resolve with Gazi Sharif, TxDOT 214-320-4414 86. 25 Railroad R.O.W and the roadway R.O.W line must be Will add A included. (Consolidated Comment # 29). Resolve with Gazi Sharif, TxDOT 214-320-4414 ,... 87. 25 Text overlapped. Will correct A Resolve with Gazi Sharif, TxDOT 214-320-4414 88. 28 Specify the type of retaining wall and referenced sheet #. A Resolve with Gazi Sharif, TxDOT 214-320-4414 89. 30 Foundation for 600 mn~ should be 1.7M instead of 1.6M Will correct A Resolve with Jahor Roy, TxDOT 214-319-6405 90. 30 A. Drawing is illegible. Please present neat and clean lay Will change to new scale and clean up la. yout A-A out. B. Present this drawing in 1:100 scale? B-A Resolve with Jahor Roy, TxDOT 214-319-6405 91. 30 Delete note 12. It is paid for under "salvaging traffic signals".Will delete A Resolve with Jahor Roy, TxDOT 214-319-6405 92. 30 Show Pave-Stone crosswalks and intersection area as a Will screen pavers and verify detector location A grey (screened) existing condition. Verify that detectors are not too close to pave-Stone. Resolve with Jack Loggins PME 214-747-6336 x 28 93. 30 Presence loop placement (compare to stop bar) is not Will correct A correct. Resolve with Jahor Roy, TxDOT 214-319-6405 94. 30, Show existing and proposed stop bars. Will show A v Action Codes Dispositioned By: _Scott Young. A - Agree, Designer will comply D - Delete, Reviewer Withdraws Comment Title: C - Disagree, Designer and E - Exception, Resolution Required Date: Reviewer Resolution Required N/A - Not Applicable 1/18/2000 F:\projects\P09Pre-Final\P9-4REV~P10\Dispositioned\P10 Consolidated W Coppell.doc DESIGN REVIEW COMMENTS DALLAS COUNTY CMAQ PROGRAM Project:: CMAQ Project 10 Submittal: 95% Review Date: December 6, 1999 ~ Sheet: 10 ~ of 11 Reviewer: Dispositioned Organization: PM/E Reviewer Telephone Number: (214) 747-6336 x 28 Item Page No. Comment - (state fully action required, i.e., clarify, Response Action No. Sheet No. change, add, delete, etc. 32 Resolve with Jack Loggins PME 214-747.6336 x 28 95. 32 No need to show traffic signals. Will screen or remove A Resolve with Gazi Sharif, TxDOT 214-320-4414 .. 96. 32 Provide unit for "Signs Summary and PVMT Marking Will provide A Summary. Resolve with Jahor Roy, TxDOT 214-319-6405 97. 43, Fill up title block with proper information. A 46-47 Resolve with Jahor Roy, TxDOT 214-319-6405 98. 25 Work Sequence #1, '~djust Utilities (By Others)", needs to Withdrawn by PM/E D include identification of "Others" and specify which Utilities"; City Utility relocations need to be included in the construction of the lane. ..'. PME Response: The only utility that can be included in the plans are storm sewer. All others shall be noted "To be relocated by others". If the City of Coppell wants to, they can pursue a separate agreement with TxDOT and possibly have utilities relocated by a TxDOT contractor. Resolve with Kent Collins, Coppell, 972-304-3679 99. Layout The legend for the Intersection Layout Sheets needs to Providing current TxDOT pavementstandard D Sheets clarify that the paving section will be concrete on an asphalt base. The City recommends using the City Standard paving section which is reinforced concrete paving on 6" lime-stabilized base. Resolve with Kent Collins, Coppell, 972-304-3679 100. 28 A Type 4 retaining wall is not acceptable from an aesthetics Will discuss with City of Coppell to determine if the D . standpoint. Consider using a "Keystone" or Pavestone" city will pay the additional cost. gravity wall. Resolve with Kent Collins, Coppell, 972-304-3679 101. 30 Note 4 needs to include who will relocate the railroad signal Railroad signal to be relocated under separate D for the project. This should be included in the Construction of contract the lane. Resolve with Kent Collins, Coppell, 972-3043679 v Action Codes Dispositioned By: __Scott Young A - Agree, Designer will comply D - Delete, Reviewer Withdraws Comment Title: C - Disagree, Designer and E - Exception,' Resolution Required Date: Reviewer Resolution Required N/A- NotApplicable 1/18/2000 F:\projects\P09Pre-Final\Pg-4REV\P10\Dispositioned\P10 Consolidated W Coppell.doc DESIGN REVIEW COMMENTS DALLAS COUNTY CMAQ PROGRAM Project:: CMAQ Project 10 Submittal: 95% Review Date: December 6, 1999 ~ sheet: 11 ~ of 11 Reviewer: Dispositioned Organization: PM/E Reviewer Telephone Number: (214) 747-6336 x 28 Item ~ Page No. ~ Comment - (state fully action required, i.e., clarify, Response Action No. Sheet No. change, add, delete, etc. 102. 18 Section A-A does not seem accurate compared to plan view. See comment #81 A Can the right turn lane actually be maintained at 3.2 m during construction? Resolve with Kent Collins, Coppell, 972-304-3679 103. 24 Note # 5 needs clarification of meaning. Will clarify A Resolve with Kent Collins, Coppell, 972-304-3679 104. General This project should stand on in own in terns of utility Withdrawn by PM/E D Notes relocations, etc. The City will not be responsible for relocation of conflicting utilities. PME Response: The only utility that can be included in the plans are storm sewer. All others shall be noted "To be relocated by others". If the City of Coppell wants .to, they can pursue a separate agreement with TxDOT and possibly have utilities relocated by a TxDOT contract6r. Resolve with Kent Collins, Coppell, 972-304-3679 105. APME TxDOT has revised the BC Standards. BC1, 4, 9, & 9A Will correct to reflect new BC std. A Comment were revised in 1999. Show these changes on the Title Sheet and the Index of Sheets. Resolve with Jack Loggins (214) 747-6336 x 28 106. A PME If the sheet numbers change between the 95% review, A Comment provide a "Table of Equals" that shows the 95% and 100% submittal sheet numbers. Provide with the 100% submittal. Resolve with Jack Loggins (214) 747-6336 x 28 v Action Codes Dispositioned By: __Scott Young A - Agree, Designer will comply D - Delete, Reviewer Withdraws Comment Title: C- Disagree, Designer and E- Exception, 'Resolution Required Date: Reviewer Resolution Required N/A - Not Applicable __.1/18/2000 F:\projects\P09Pre-Final\P9-4REV~P10\Dispositioned\P10 Consolidated W Coppell.doc