Loading...
SC-Coppell HS-CS 870908September 8, 1987 M.~A!.an Ratliff CityX~xanager City oT~gppell P.O. BoxX~8 Coppell, Te~,,~s 750]9 Dear Mr. Ratliff: I have been advised through our contractor on the High School project that the neighbor adjoining our southeast corner has constructed a fence along the school property line. Our survey indicates that there is a 30 ft. public right-of-way directly south of property for Willow Lane; and in fact, our site drainage plans call for a transition be- tween our box culvert and the existing ditch to occur in the Willow Lane right-of-way. As you can see, there is presently a problem. Our contractor is ready to clear the area around the end of the box culvert, which will be directly under the neighbor's fence. Our records would indicate that his fence occurs within the City right-of-way for Willow Lane, and unless the fence is moved within the next two or three days, progress of our work will be impeded. You may be aware that the property owner has a large dog and is presently protesting the right of our contractor to perform any improvements in the right-of-way. Please look into this matter at your earliest possible convenience so that progress on our construction can continue. Thank you in advance for your help. Very truly yours, Dr. David P, Stanfield Superintendent of Schools cc:~teve Morton, City of Coppell Gary Keep, SHWC John Mall, Teague, Nall& Perkins