Loading...
SC-Coppell HS-CS 870826TEAGUE NALL AND PERKINS. INC. 915 Florence Street/Fort Worth, Texas 76102 817 336-5773 August 26, 1987 C 0 P Y Mr. Jerry Conatser L. D. Conatser Contractors P.O. Box 15302 Fort Worth, Texas 76119 Re: Coppell High School Benchmark Dear Jerry: On Tuesday, August 26, we received correspondence from your surveyor, J. B. Davies, regarding a conflict between the two benchmarks shown on the construction plans. Your surveyor used the benchmark designated "B.M." on the drawings with elevation 467.22 and ran a loop to the second bencPm~rk shown on the drawings designated "T.B.M." with elevation 484.23 and found a 0.56-foot discrepancy between the t~ bencP~arks as shown on the drawings ~nd what they determined it should be in the field. We have contacted Ayers & Associates, the owner's surveyor, who performed the topographic survey for the site and requested that they verify this discrepancy. ~ley have subsequently informed us that the B.M. sh~n on the dr~ings with elevation 467.22 is a F~4A b~machmark and using it to check into anot~her FE~ benchrm~rk in ~_he area, ~]ere was a 1.03 foot discrepancy. Therefore, Ayers & Associates took the difference between ~e t~,~ benc~hn~ks, divided it Ln half and applied that to their to B.M. which would account for the .56 discrepancy which J. B. Davies discovered. Therefore, all construction staking shall be performed by using the T.B.M. benchmark of elevation 484.23 for the site. (This T.B.M. is 0.56 feet lower ~an the FEMA datum.) This infornu~tion was given to J. B. Davies per their request on Tuesday, August 26 by phone. Should you have any further questions regarding this matter, please do not hesitate to call. Sincerely, STR/kfs CC: Jim Boughton, SHWC Tom M~Kenna, SHWC Harlan Walker, Ayers & Associates Jim Davies, J. B. Davies Steve ~rton, City of Coppell ~/ Saad Hineidi, Maxim Engineers Powell & Powell John Nall, TNP