SC-Town Center E8-CS 940831 COPPELL PUBLIC WORKS MEMORANDUM DATE: August 31, 1994 ' TO: Larry Davis, Construction Inspector FROM: Howard L. Pafford, Utilities Superintendent RE: Final Utility Walk Through for Heartz Rd. - C.I.S.D. Elementary #8 The above referenced project had a walk-through on 8/30/94 and the following items were found to be deficient: 1. Need to install locking hasp on fire vault. 2. Raise valve stack pad behind fire vault and pour pad. 3. Raise gate valve boxes behind both 2" water meters to grade. 4. Station 1+21.31 - Manhole needs to have invert reworked, pipe cut back, and concrete sealer applied to seal inflow. This is poor invert construction and should be looked at very carefully for stability. 5. Station 3+96.16 - Manhole needs to have invert reworked, pipe cut back, and concrete sealer applied to seal inflow. This is poor invert construction and should be looked at very carefully for stability. 6. Station ~5+20.82 - Manhole needs to have invert reworked, pipe cut back, and concrete sealer applied to seal inflow. This is poor invert construction and should be looked at very carefully for stability. Please ensure these items are corrected within the next few weeks. It is essential that these items be taken care of in a suitable time frame. If you have any questions, please advise. HLP/dm WALKTHRU.HLP/ELEM#8