July 14, 1993
Mr. Mike Elmore
SHW Group, Inc.
P.O. Box 619087
Dallas, Texas 75261
RE: Heartz Road Elementary (Coppell Elementary//8)
Development Fees
Dear Mr. Elmore:
We are enclosing a copy of the City of Coppell development fee calculations for Heartz Road
Elementary School.
Typically, a portion of the fees are due at the time of Council approval, a portion at the time
of the Building Permit and a portion prior to the issuance of the meters. However, the permit
has already been issued for this site and no fees have been collected. At this time, a check
should be provided in the amount of $28,201.07. This covers the amount that was due at the
time of Council approval and at the issuance of the Building Permit plus 2 % inspection fee. The
remaining $396.84 will be due at the issuance of the irrigation meters.
Please provide a check made payable to the City of Coppell in the amount of $28,201.07 and
forward it to Mr. Alan Johnson, Acting Finance Director, Finance Department, along with a
copy of the fee calculations as soon as possible.
Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us
verify payment of the required fees for this project.
If you have any questions, please do not hesitate to contact me.
Sincerely,
cc. s,., oora .., o, P,,. wo.
Alan Johnson, Acting Finance Director
Kenneth M. Griffin, P.E Greg Jones, Building Official
City Engineer Gary L. Sieb, Director of Planning
Larry Davis, Construction Inspector
CITY OF COPPELL
DEVELOPMENT FEES
Date: July 14,1993
Project: Heartz Road Elementary (Coppell Elementary #8)
AMOUNT DUE
TOTAL PRIOR TO COUNCIL
ASSESSMENT APPROVAL
Water Impact Fee $17,225.00 $17,225.00
(100% due prior to Council Approval)
Wastewater Impact (MUD)
(100% due prior to Council Approval) $ 7,200.00 $ 7,200.00
Utility Final Inspection Fee *$ 50.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee *$ 300.00
($200.00 due at Issuance of Building Permit)
($100.00 due at Issuance of Irrigation Meter)
Water Meter Fee *$ 2,634.37
(100% due prior to Issuance of Building Permit)
Irrigation *$ 296.84
(100% due prior to Issuance of Water Meters)
Total $27,706.21 $24,425.00
2% INSPECTION FEE $ 891.70
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $24,425.00
* TOTAL AMOUNT DUE PRIOR TO BUILDING PERMIT $ 2 ,884.37
TOTAL AMOUNT NOW DUE AND PAYABLE $28,201.07
*The remaining $396.84 is due at the time the meters are issued.
file/develop/irrigfee, rrm
"-° P.o. Box 86s HAMILTON, TEXAS 76531 1}17-365-3181
JuLy ?, 1993
Mr. Mike E~more
S H W Broup, Znc.
Da~as, Texas ?D2S~
RE: Town Center £~ementary School
Dear Mike: ~,; ~r~. ~
As requested, the price to ~rovide the ~ol~owing is~~.~
Two (2) s.s. manholes, 8" sewer line, ~wo (2) storm inlets~
3~B ~.~. of 48" ~CP pipe, and 180 1. f. of 2?" RCP pipe. Ail as
shown in ~i~y's easement.
Trusting ~his is ~he in£ormation you need.
SincereLy,
K.A. S~arks Contractor, ~nc.
J~ S~hooler
President
cc: ~.J. Williams
COPPELL PUBLIC WORKS
MEMORANDUM
DATE: July 14, 1993
TO: Ken Griffin, City ~ngin~er ~
FROM: Public Works Staff ~
RE: Development Fees for Heartz.'~oad Elementary
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
1 - 3" Domestic Meter/s = 16 ESU's
1 - 2" Irrigation Meter/s = 8 ESU's
1 - 8" Fireline Meter/s = 2.5 ESU's
Total 26.5 ESU's @ $650.00 ea = $ 17,225.00
100% due prior to Council approval of the final plat.
Wastewater Impact (MUD)
1 - 3" Residential Meters = 16 ESU's
Total 16 ESU's @ $225.00 ea = $ 7,200.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
3 Connections @ $100.00 each = $ 300.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
100% due prior to issuance of building permit.
Utility Final Inspection Fee
1 lots @ $50.00/lot = $ 50.00
100% due prior to issuance of building permit.
Development Fees
Page 2
Water Meter Fee (Lots)
1 - 3" Residential Meters @ $1,102.20 = $ 1,102.20
1 - 8" X ~" DDC Fire Meter @ $1,532.17 = $ 1,532.17
100% due prior to issuance of building permit.
Water Meter Fee (Irrigation)
1 - 2" Irrigation Meters @ $296.84 ea = $296.84
100% due prior to issuance of water meters.
HLP/dm
cc: Steven G. Goram
Director of Public Works
File
FEES.HLP/HEARTZ.HLP
coPP wo s
MEMORANDUM $.
DATE: July 14, 1993
TO: Ken Griffin, City ~ngin~er ~
FROM: Public Works Staff~~
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
1 - 3" Domestic Meter/s = 16 ESU's
1 - 2" Irrigation Meter/s = 8 ESU's
I - 8"--~ Fireline Meter/s = 2.5 ESU's
Total 26.5 ESU's ~ $650.00 ea = $ 17,225.00
100% due prior to Council approval of the final plat.
Wastewater Impact (MUD)
1 - 3" Residential Meters = 16 ESU's
Total 16 ESU's @ $225.00 ea = $ 7,200.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
3 Connections ~ $100.00 each = $ 300.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
100% due prior to issuance of building permit.
Utility Final Inspection Fee
1 lots @ $50.00/lot = $ 50.00
100% due prior to issuance of building permit.