SC-Town Center E8-CS 930712 '---- --~--/ ~ ~ ¢' "'" ~Ox 4,,-'8
· :7 ':::=~"' '--¢~ .... ~"-- ?'~7;~'-'z'""-'-~--~:'~-:--7;'?--':~"2:~? Copl:)eli. Texas 75019
"----"/ /'----'" The C~t',' Wqh A Beaut,ful Future 214-462--0022
.-"--3' /~. ·
:'--4 !------" /'
July 12, 1993
Mike Elmore
SHW Group, Inc.
P.O. Box 619087
Dallas, TX 75261
RE: Coppell Elementary #8, Town Center
Heartz Road Site
Dear Mr. Elmore:
The City of Coppell has received and reviewed the referenced plans and has the following
comments to offer:
1. The 20' sanitary sewer easement shown on Sheet 2.6 doesn't match what is
shown on the plat.
2. Starting on Sheet 2.6, the true north arrow for the key plan shown in the right
margin is shown incorrectly. Please verify and correct each sheet.
3. Referring to the on-site and off-site drainage area map on Sheet 2.8, provide a
clear delination of the drainage areas.
4. Delete the existing manhole and 8" stubout as indicated on Sheet 2.9 of the
sanitary sewer plans.
5. Correct the spelling mistakes indicated on the note boxes on Sheet 2.10.
6. Provide water meter details as per City of Coppell Standard Construction Details.
7. A set of the City's Standard Construction Details must be present on the job site.
A full size an be purchased for $50.00 and a half size for $15.00 through the
City's Engineering Department.
8. The City's Standard Details should be used when applicable i.e., typical pavement
section, typical integral curb detail, concrete sidewalk roll-down curb, transverse
expansion joint, typical construction joint.
There are various other minor comments throughout these plans. Once these comments
have been addressed, the revised set of plans should be resubmitted to the City for
review. If you should have any questions concerning these comments, please feel free
to contact me at your convenience.
Sincerely,
Michael A. Martin, E.I.T.