SC-Town Center E8-CS 930429 2. The property in the floodplain, on Lots 14-35, Block E should be included as part
of the Homeowners Association, not part of the private lots. Also, access to that
common area should be provided.
3. The floodway should be labeled.
4. The master plan shows a future 30" sewer line along the southern property line
between MacArthur and Village Parkway. If MUD is satisfied that the current
27" is sufficient, then a letter should be provided from the MUD District.
May 6th, 1993 Final Comments:
1. The floodway behind Lots 14-35, Block E should be labeled
Floodplain/Floodway.
2. The note concerning the variable width floodplain/floodway easement should be
revised as noted at the DRC meeting.
3. A letter is still required from the MUD District concerning the existing 27" MUD
line between MacArthur Blvd. and Village Parkway.
7. Georgetown Plaza Shopping Center.
1. Sidewalks along Samuel Blvd. should be constructed.
2. Some type of agreement should be worked out between St. Ann's Catholic
Church and the City of Coppell to allow access across the existing paved surface
along the northern part of this property when needed during the construction of
Sandy Lake Road.
3. Escrow for Sandy Lake Road should be paid if that has not already been paid
with the initial platting of the property. Staff is currently researching the issue.
8. Heartz Road Elementary School Final Plat (Town Center Elementary School).
1. Escrow and/or an escrow agreement should be executed for the schools
responsibility for the future construction of the street along the west side of the
property for the ring road.