November 17, 1999
Mr. Ken Griffin, P.E.
City of Coppell
255 Parkway Blvd.
Coppell, Texas 75225
Subject: Congestion Mitigation Air Quality (CMAQ) Program Review Of 95% Design Submittal - CMAQ Project t 0
Dear Mr. Griffin:
Attached, please find the 95% design submittal and estimates for CMAQ Project 10 submitted
by USA Professional Services Group, Inc. Electronic copies of the review comment forms
have been previously provided, for your use.
There is a 22-day review cycle. To assure that all comments can be coordinated through this
office, for submittal to the designer, electronic review comments must be returned to this
office no later than December 13, 1999. The designer will be given one week to formulate
their responses to the comments. Once all comments are dispositioned, the designer will
prepare the 100% submittal.
If you have any other questions about the schedule for review or the submittal, please call me
at 747-6336 ext. 26 or Jack Loggins at ext. 28.
Sincerely, "",
Ivan F. Nicodemus, P.E.
Program Manager
Attachments: (1 .) Pre-Final (95%) Design Drawings - 2 sets
(2.) Estimate - 2 sets
(3.) General Notes - 2 sets
cc: Donald L. Cranford, Dallas County, w/o attachments
Moosa Saghian, P.E., TxDOT. Special Projects Office, w/o attachments
Suja Matthew, P.E., TxDOT, Special Projects Office, w/o attachments
Scott Young, P.E., USA Professional Services Group, Inc., w/o attachments
Over a Century of
Engineering Excellence
G :\G04CORR\G4-10UT%C OPPELL\1999"023_P 10 Review 95%. doc
PB Parsons CMAQ Program Office
Brinckerhoff 170 1 N. Market Street
Suite 4 10
Io0 Dallas, TX 75202
YEARS
214-747-6336
Fax: 214-741-1937
E-mail: cmaq@onramp.net
November 17, 1999
Mr. Moosa Saghian, P.E.
Texas Department of Transportation
PO Box 3067
Dallas, Texas 75221-3067
Subject: Congestion Mitigation Air Quality (CMAQ) Program
Review Of 95% Design Submittal - CMAQ Project t 0
Dear Mr. Saghian:
Attached, please find the 95% design submittal and estimates for CMAQ Project 10
submitted by USA Professional Services Group, Inc. Electronic copies of the review
comment forms have been previously provided, for your use.
There is a 22-day review cycle. To assure that all comments can be coordinated
through this office, for submittal to the designer, electronic review comments must be
returned to this office no later than December 13, 1999. The designer will be given
one week to formulate their responses to the comments. Once all comments are
dispositioned, the designer will prepare the 100% submittal.
If you have any other questions about the schedule for review or the submittal, please
call me at 747-6336 ext. 26 or Jack Loggins at ext. 28.
Ivan F. Nicodemus, P.E.
Program Manager
Attachments: (1 .) Pre-Final (95%) Design Drawings - 4 sets
(2.) Estimate - 4 sets
(3.) General Notes - 4 sets
cc: Donald L. Cranford, P.E., Dallas County Asst. Dir., Trans. & Plan., w/o attach.'s
Moosa Saghian, P.E. Texas Department of Transportation, w/o attach.'s
Kenneth Griffin, P.E., City of Coppell, w/o attach.'s
Maher Ghanayem, P.E., Texas Department of Transportation, w/o attach.'s
Scott Young, P.E., USA Professional Services Group, Inc., w/o attach.'s