Loading...
ST9602-CS 991117PB Parsons CMAQ Program Office i~: Brinckerhoff 1701 N. Market Street Suite 410 - lee2 Dallas, TX 75202 214-747-6336 Fax: 214-741-1937 E-ma~: cmaq@onramp.net November 17, 1999 Mr. Ken Griffin, P.E. City of Coppell 255 Parkway Blvd. Coppell, Texas 75225 Subject: Congestion Mitigation Air Quality (CMAQ) Program Review Of 95% Design Submittal - CMAQ Project t 0 Dear Mr. Griffin: Attached, please find the 95% design submittal and estimates for CMAQ Project 10 submitted by USA Professional Services Group, Inc. Electronic copies of the review comment forms have been previously provided, for your use. There is a 22-day review cycle. To assure that all comments can be coordinated through this office, for submittal to the designer, electronic review comments must be returned to this office no later than December 13, 1999. The designer will be given one week to formulate their responses to the comments. Once all comments are dispositioned, the designer will prepare the 100% submittal. If you have any other questions about the schedule for review or the submittal, please call me at 747-6336 ext. 26 or Jack Loggins at ext. 28. Sincerely, "", Ivan F. Nicodemus, P.E. Program Manager Attachments: (1 .) Pre-Final (95%) Design Drawings - 2 sets (2.) Estimate - 2 sets (3.) General Notes - 2 sets cc: Donald L. Cranford, Dallas County, w/o attachments Moosa Saghian, P.E., TxDOT. Special Projects Office, w/o attachments Suja Matthew, P.E., TxDOT, Special Projects Office, w/o attachments Scott Young, P.E., USA Professional Services Group, Inc., w/o attachments Over a Century of Engineering Excellence G :\G04CORR\G4-10UT%C OPPELL\1999"023_P 10 Review 95%. doc PB Parsons CMAQ Program Office Brinckerhoff 170 1 N. Market Street Suite 4 10 Io0 Dallas, TX 75202 YEARS 214-747-6336 Fax: 214-741-1937 E-mail: cmaq@onramp.net November 17, 1999 Mr. Moosa Saghian, P.E. Texas Department of Transportation PO Box 3067 Dallas, Texas 75221-3067 Subject: Congestion Mitigation Air Quality (CMAQ) Program Review Of 95% Design Submittal - CMAQ Project t 0 Dear Mr. Saghian: Attached, please find the 95% design submittal and estimates for CMAQ Project 10 submitted by USA Professional Services Group, Inc. Electronic copies of the review comment forms have been previously provided, for your use. There is a 22-day review cycle. To assure that all comments can be coordinated through this office, for submittal to the designer, electronic review comments must be returned to this office no later than December 13, 1999. The designer will be given one week to formulate their responses to the comments. Once all comments are dispositioned, the designer will prepare the 100% submittal. If you have any other questions about the schedule for review or the submittal, please call me at 747-6336 ext. 26 or Jack Loggins at ext. 28. Ivan F. Nicodemus, P.E. Program Manager Attachments: (1 .) Pre-Final (95%) Design Drawings - 4 sets (2.) Estimate - 4 sets (3.) General Notes - 4 sets cc: Donald L. Cranford, P.E., Dallas County Asst. Dir., Trans. & Plan., w/o attach.'s Moosa Saghian, P.E. Texas Department of Transportation, w/o attach.'s Kenneth Griffin, P.E., City of Coppell, w/o attach.'s Maher Ghanayem, P.E., Texas Department of Transportation, w/o attach.'s Scott Young, P.E., USA Professional Services Group, Inc., w/o attach.'s Over a Century of Engineering Excellence G :\G04CORR\G4-10UT~TXDO'I'%1999%622_P 10 Review 95%. doc