Loading...
SC-Town Center E8-LR 931103 Pone Engineers R o n e E n ai n e e r s Geotechnical ConsuRants Materials Testing .Concrete Cylinder Test Report role.ct., IPurchase Order TOWN CENTER ELEMENTARY - COPPELL, TEXAS J JNumOer iD'ale of Obsewa~on .Report Date J D3-080C-01-24462-B I SEPT. 21, 1993 NOV. 3, 1993 ITc J COPPELL I.S.D. II~.a~on NORTH DRIVE, 25' E/W END K. A. SPARKS CONTRACTORS, INC. Supplier = j Mix Numoer iMix Descn,~on ; I j' Weather Conai'~ons .!.Am::~em ieml:~ra~re. ~,;'°m IConcr, e/,e TemDera,'ure. (%=), PARTLY CLOUDY ' i 79 i 81 '~me Samoiec: i Water 10:05 AM : 0.0 GALS Physical Data ACTUAL ' SPECIFICATiONS SLUMP (in.) 5 3/4 Concrete Cyiinder Test(s) ACTUAL SPECIFICATIONS SCeC:.men i Age ; To,. LoacJ J Comoressive ,Smen¢ S,~'engrt Required No. j (Days. = Tes~ DaTe 244 7 09/28/93 69000 2440 3000 ?-45 28 10/19/93 80000 ?-830 2,[6 28 10/19/93 83500 2950 ?-47 42 3.1/02/93 93000 3290 Cunng Memoa Tern Me~,Oa JS~ncaJ'cl ~' x 12' jEngin_-er/'T'echnic{;an ASTM C 31 IASTM C ,39 iA/ea 28.27 sO. in. j RANDY WORTHEN Remarks e. nC/or Ois~3bu~on COPPELL I.S.D./MICKEY HARPER (1), CITY OF COPPELL/LARRY DAVIS (1), K. A. SPARKS CONTRACTORS, INC./E. J. WILLIAMS (1), S.H.W.I.N.C./ MIKE ELMORE (1), S.H.W.I.N.C./JOE CRADDOCK, V.P. (1), K. A. SPARKS CONTRACTORS, INC./E.J.WILLIAMS (1) NOTE: BROKE HOLD C/LINDER AT 42 DAYS INSTEAD OF 56 DAYS one Engineers