Loading...
SC-Town Center E8-LR 931102 none Engineers Rone E naineers Geotechnioal Consu~ants Materials Testing !Concrete Cylinder Test Report iProje~ IPurcnase Order TOWN CENTER ELEMENTARY - COPPELL, TEXAS Numoer .' jD~te of Observazion IRe.port Da~e D3-080C-01-24631 !OCT. 4, 1993 J NOV. 2, 1993 I.S.D. JLoca~on !WING WALL ON WEST SIDE OF C SECTION FOR AIR CONDITION. K. A. SPARKS CONTRACTORS, INC. Supp6er i ?,a.r'K. Truck LATTIMORE j 06 ! 310 ! 1012216 IMb( Numoer !Mix Description J5 1/2 SKi lWeamer Conciii~ons iAm:~_m Tempera~'~'re (°F)/ JConc-rete Tem.c~mture I PARTLY CLOUDY ! 64 i 78 ~me Samp~c i Wa~er ACdea 18:30 AM ! 0.0 GALS iPhysical Data A C/UAL SPE CIFiCA~ONS SLUMP (in.) 5 Concrete Cyiinder Test(s) ACTUAL SP F_. C lFICATIONS j Tot Load i C~3moress~e S'c~ncj~ Streng~ Reauired Soe~,men Age i Test Date · ' No. " IDavs) i flbs.) i (p, sB (psll 312 7 10/11/93 76500 2710 3000 313 28 11/01/93 89000 3150 314 28 11/01/93 91000 3220 315 HOLD HOLD Cudng Me',nod Test Me~od S~ndard S' x 12' ~ngineer/Tecnn,¢an !AS.-MC31 ASTMC39 A/ea 28.27 sq. n. , GEORGE BEALL (RONE) Remains and/or D~'mbu~Jon COPPELL I.S.D./MICKEY HARPER (1), CITY OF COPPELL/LARRY DAVIS (1), K. A. SPARKS CONTRACTORS, INC./E. J. WILLIAMS (1), S.H.W. I.N.C./ MIKE ELMORE (1), S.H.W. I.N.C./JOE CRADDOCK, V.P. (1), K. A. SPARKS CONTRACTORS, INC./E.J.WILLIAMS (1) '~one Engineers Rone Engineers RoneEngineers Geotechn~cai Consultants Materials Testing r.,.. ::-': ..: ..; .... ..~ ~ Mortar Cube Report Project Town Center Elementary - CoDpell, Texas Number Sample Date i Report Date D3080C-24632 10-04 -93 11-02 -93 To Coppell ISD Contractor K.A. Sparks Supplier On Site CuDe Size i'Sme Samole~ Location of Placement 2 X 2 3:47 pm Stage wall-S.W. Interior wall 15th-17th Temperature Weather Conditions Ambient 81 °F: Mo~ar 82 °F: Mostly sunny M ateriais Description Weigi~t (Grams) Cement Type N Fine Ag~;regate ~1 Fine Aggregate ?2 Admixture ; i Water Adde(~ Air Content Speczmen AGe Flow Total LoaQ Compressive Strength Strength Required Number (Days) Date Tested ~ (in). (lbs.) (PSO (psi) i. i 7 10-11-93 ! 1950 490 * 500 @ 7 Day..s 2 :28 11-01-93 i 3500 875 ** 900 @ 28 Days 3 128 11-01-93 3400 850 ** ;Cunng Method and ;Test Methocl Cubes Made 8y i ASTM C 109 I G=ry Moore Remarks and/or Distnbudon *Does not meet 7 day strength requirements as per ASTM C-91, Table **Does not meet 28 day strength requirements as per ASTM C-91, Table