SC-Town Center E8-LR 930920Rone Engineers Ro n e E'n ' nee r s
Geotechnical Consultants
Matedais Testing
!Concrete Cylinder Test Report
Proiec~_' Purchase Order
TOWN CENT~..A ~..L~.M1~.NTAA¥ - COPPI~.T,T,. TEX.~S
Num, oer " JDaxe o! Observa,~on JP, eport ~"te
! D3-0800-01-24114 !AUGUST ?3, 19g'~! .~V. PT. 2n, lqql
I COPPELL I.S.D.
Lcx:~lion
! GRADE BEAM AREA B #22
i K. A. SPARKS CONTRACTORS, INC
!Suppfier [ ~J'r: 'Truck ~ci~e:
i ~TTIMOAE ! ~.49 ! 10~48
iMk Numt~er iMix Desc~.pdon
lWea~er C. ondibons [Arn.--'iem Temperature
~ CL~ ~ 97 : 98
~me S~p,ed ~ Water Aco~
~ 1:.45 PM ~ 0.0 GALS
;Physicai Data
. ACTUAL SP_C.
SLUMP (in.) 5 1/2
Concrete Cyiinder Test(s)
ACTUAL SPECIFICATIONS
j S.c~::men Age !
J No., fDays). .j Test Date ;; Tot(Ibs.)Loacl . Comoressive(.msi) Si~ngm S -~eng~.(psi)Required
168 7 08/30/93 116000 4100 3000 ·
j 169 28 09/20/93 135000 4780
170 28 09/20/93 139000 4920
171 ~OLD HOLD
I
jCunng Memod,iTest Memod !lS~nca~d28.27S'sq.X 12'in. Engineer/Technician
IAS'TM C 31 IASTM C 39 ~Area, I ',
'Rereads and/or O~'mbu~on 'i
COPPELL I.S.D./MICKEY HARPER (1), CITY OF COPPELL/LARRY DAVIS (1),
K. A. SPARKS CONTRACTORS, INC./E. J. WILLIAMS (1), S.H.W. I.N.C./ '
MIKE ELMORE (1), S.H.W.I.N.C./JOE CRADDOCK, V.P. (1),
K. A. SPARKS CONTRACTORS, INC./E.J.WILLIAMS (1)
-
Rone Engineers RoneE ineers
Geotechnical Consuitanr. s
Ma£edsis Testing
IConcrete Cylinder Test Report,
IPurchase Oroer
iProjec:
TOWN CENTER ELEMENTARY - COPPELL, TW. XAS
I D3-080C-01-24114-A I AUGUST 23, 1993
Fo
i COPPELL I.S.D.
Locm~on
GRADE BEAMS AREA B ~22
K. A. SPARKS CONTRACTORS, INC.
LATTIMORE i i 433 ! 13064
M~ Number hMk
;Weamer Conditions
CLEAR 'i 100 , 98
~me Sam-~4ec ; Wa~er Acce-J.
2:.40 PM :. 0.0 GALS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5 3/4
Concrete Cyiinder Test(s)
ACTUAL SPECIFICATIONS
~soec~,men i Age i Tot Load i Com,~ressh,e S'~u'encj~ St~encj~. Required
No. ! tDays) Test Date
172 7 08/30/93 95000 3360 3000
173 28 09/20/93 110000 3890
~74 28 09/20/93 117000 4140
175 HOLD HOLD
ICunngMemoa iTes~, Memod IS~nca~d S' x 12' iEngineer/Tecnnicia~
{Area 28.27 sq. in,. I RANDY WORTHEN
Remark~ and/or
COPPELL I.S.D./MICKEY HARPER (Z), CITY OF COPPELL/LARRY DAVIS (1),
K. A. SPARKS CONTRACTORS, INC./E. J. WILLIAMS (1), S.H.W.I.N.C./
MIKE ELMORE (1), S.H.W.I.N.C./JOE CRADDOCK, V.P. (1),
K. A. SPARKS CONTRACTORS, INC./E.J.WILLIAMS (1)
Rone Engineers
,o.e =...¢.ee,s RoneEn ineers
Geotechnical Consultants
Materials Testing
~Concrete Cylinder Test Report
TOWN CENTER ELEMENTARY - COPPELL, TEXAS
iNumber .- iDa.re of Observa~on !Re?orr D~te
I D3-080C-01-24114-B ! AUGUST 23, 1993 ] .q~p9*. PO, lq~'~
To
COPPELL I.S.D.
, GRADE BEAMS AREA B ~23
C, on~rac~,or
K. A. SPARKS CONTRACTORS, INC.
I
i
LATTIMORE ! 249 ~
Mix Numcer iMix Descnpt~on
i
!Weather Condi~ons ,.AmD+~,~,, Temperature ¢,~, IConcrete Tempe.,~rare (°,~.
i CLEAR '~ z00 i 99
~ ~--Lme Sampled Water Accec~
~ 3:.30 PM 0.0 GALS
,, .
',Physical Data
ACTUAL SPECIFICA~ONS
SLUMP (in.) 5 1/2
Concrete Cyiinder Test(s)
ACTUAL SPECIFICATIONS
S.c~c~men; Age ; Test, D~e i Tot Loaa Cornor~ss~e S'a'~ng%-n S~Dg'~ R~uir~
No. ! (Days) , I Cbs.) . t~ ~
176 7 08/30/93 94000 3330 3000
177 28 09/20/93 111000 3930 .
178 28 09/20/93 115000 4070
179 HOLD HOLD
i Cunmg Me~qocl {Test Me~hod iStancard 6' x 1~ EnGineer/Tecnnician
I
iA~ea 2S.~.7 sq. in. RANDY WORTHEN
IAS'EM C 31 ~ASTM C 39 I
Remarks and/or D~"~bu~on
COPPELL I.S.D./MICKEY HARPER (l), CITY OF COPPELL/LARRY DAVIS (1),
K. A. SPARKS CONTRACTORS, INC./E. J. WILLIAMS (1), S.H.W. I.N.C./
MIKE ELMORE (1), S.H.W. I.N.C./JOE CRADDOCK, V.P. (1),
K. A. SPARKS CONTRACTORS, INC./E.J.WILLIAMS (1)
Rone Engineers