Loading...
Shadowridge P1-3-CS 910709The City With A Beautiful Future July 9, 1991 Mr. Robert Delvo 201 Magnolia Court Coppell, TX 75019 Re: Open Drainage Channel ,0. Box 478 /..~'~ ? ~:,? Coppell, Texas 75019 ~'~ <~.__~-.462 - 0022 Dear Mr. Delvo: This letter is in response to your letter dated April 15, 1991, regarding the open channel north of your property. At first, I wish to extend my apologies to you for such an unexpected delay in responding. Please note that I have reviewed and analized all of your comments very carefully, and have also coordinated with other City staff members concerning this matter. The following comments are provided based on my findings: 1) Closed Storm System: The open channel was originally designed and constructed as part of Shadow Ridge Estates Development, and was intended to accommodate ultimate off-site drainage, including portions of Devonshire Addition. Due to downzoning from duplex to single family, the calculated amount of ultimate drainage outfall from Devonshire into the open channel has been reduced. The option of an underground storm pipe does exist, however, the probable estimated cost of this alternative is $96,000. 2) Open Channel/High Velocity/Steep Slope: Prior to any work commenced by G. Development the existing open channel with the flume may not have functioned as intended. However, this channel is currently being reconstructed and improved by G. Development. The cost for such improvement is estimated at $15,000 - $20,000. The channel's side slope is proposed not to exceed 3 to 1 (33%), which is generally considered acceptable and mowable. The channel will also be hydromulched as an erosion control measure, where applicable. Letter to Mr. Delvo July 9, 1991 Page 2 The velocity of the flow in the channel, according to the construction plans, is 2.6 fps (±), which is considered to be a low and non-erodable velocity. In order to minimize steeper slopes, and thereby to minimize erosion, G. Development has proposed to enclose the eastern end of the open channel by placing an underground 42" RCP. 3) Regular Channel Maintenance: 4) The concrete lined portions of the channel, such as storm sewer pipe outfall, will be maintained by the Street Division of Public Works. However, as you know, and as a general policy, the responsibility of maintaining the grassed channel remains with each homeowner and/or Homeowner's Association. Again, in staff's opinion, this open channel will function more efficiently as a result of improvements presently undertaken by G. Development. Staff recommends that some type of Homeowner's Association be created to maintain this channel on a regular basis. Fence Installation by G. Development and Coppell ISD: According to the approved final plat, for Devonshire Addition and under special conditions, it is stated that "Homeowners adjacent to the south boundary of the existing drainage channel may have their fences extended along the south side of the existing drainage easement, if they desire to enter into an agreement with G. Development ..." It is our understanding that the Coppell 1SD will install fences along its northern property line. This may eliminate any potential access from the school onto the drainage easement. Installation of a fence along the actual property line between Shadow Ridge Estates and Devonshire is not desirable, since it will create an isolated area with minimum access to maintain utilities within this easement. It is my understanding that the Devonshire Zoning Case did not require a fence to be constructed at this location. Letter to Mr. Delvo July 9, 1991 Page 3 5) Underground Pipe Requested: As noted earlier, if affected homeowners wish to pursue enclosing this drainage system, their active participation is recommended. An open drainage channel is, in general, an acceptable methodof handling drainage. There was no specific requirement for G. Development to enclose this system, however, they have attempted to improve the condition considerably, even though the channel was outside of their property. If you have any questions and/or wish to discuss referenced items in more detail, please call me at 393-1016. Sincerely, ~ / Actinf; City Engineer MSD/bd cc: Alan D. Ratliff, City Manager Gary L. Sieb, Director of Planning and Community serVices Steve Goram, Director Of Public Works Larry Davis, Construction Inspector DELVO