SC-Town Center E8-LR 930909Geoteciqnicai Consultants .
Matenals Testing
GENERAL REPORT
Project
TOWN CENTER ELEMENTARY - COPPELL, TEXAS
Number Sample Date IReport Date
D3080C 24323 9-7-93 I 9-9-93
To
COPPELL I.$.D.
Rel~ort of
Gradations of Lime Treated Soils
Identification
Method of Test
THD 260.4
Results
ACTUAL REOUIRED
Location % PASSING % PASSING % PASSING % PASSING
1 3/4" Sieve - ~4 Sieve 1 3/4" Sieve - ~4 Sieve
NORTH DRIVE 100'
W OF HEARTZ RD 100 72 100 60
NORTH WEST 100 70 100 60
PARKING LOT
NORTH EAST DR 100 70 100 60
SOUTH EAST DR 100 74 100 60
Coppell I.S.D./Mickey Harper (1)
City oc Coppell/Greg Jones (1)
K.A Sparks Contractors, Inc./ E.J. Williams (1)
S.H.W.I.N.C./Mike Elmore (1)
S.H.W.I.N.C./Joe Craddock, V.P. (1) ^.~
K.A. Sparks Contractors, Inc. (1)
Rone Enginee~
Rone Engineers
Geotechnical Consultants
Matedais Testing i
!Concrete Cylinder Test Report
i
CENTER ELEMENTARY - COPPELL, TEXAS 'lPur~=se
Oroer
jN IDate of Observa~on IReport Da~e
~':~r080C'"01--24269 !AUGLTST 31~ 3.993I SF. PT. 9, 1993
rr°co~PELL' I. S. D.
CONT CTO S, INC.
. , ! 118 ~-7842
}Mix Numoer iMix Descnp~on
I'q~ ¢~ie~M !Wa,er ^cried 0. 0 GALS
i
Physica! Data
ACTUAL SPECIFICA~ONS
SLUMP (in.) 5
Concrete Cylinder Test(s)
ACTUAL
SPECIFICATIONS
fScec~men Age I I Tot Load i Oomoressive Str~nq'J3 St3~ncj~ Re<3uired
' Test Date ~ '
18~ 7 ' 09/07/93' 82000' 2900
3OO0
181 28 09/28/93
182 28 09/28/93
183 HOLD HOLD
jCunng Method iTest Me~od IStan~a. rcl 6' x 12'
: iAr~ 2s.~7,~. in. !=-n~-'n~e~/"~[~t~.il~ WHITE (RONE)
[AS,i'/vi C 31 IASTM C 39 '
~~/~rL°~'~.'~.D./MICKEY HARPER (1), CITY OF COPPELL/LARRY DAVIS (Z),
K. a. SPARKS CONTRACTORS, INC./E. J. WILLIAMS (1), S.H.W.I.N.C./
MIKE ELMORE (1), S.H.W.I.N.C./JOE CRADDOCK, V.P. (1),
K. A. SPARKS CONTRACTORS, INC./E.J.WILLIAMS (1)
no.e e.g~.e~rs RoneEncineer
S
Geotechnical ConsuEants
Matedais Testing
Concrete Cylinder Test Report
Proiec: J PurChase Oraer
TOWN CENTER ELEMENTARY - COPPELL, TEXAS
Number .' D-ate o; Obsen/aaon Report Date
D3-080C-01-24269-A AUGUST 31, 1993 ! SEPT. 9, 1993
TEOPPELL 'T. S. D.
u~H EAST SECTION GRADE BEAM
c~.tm~'A°r. SPARKS CONTRACTORS, INC.
iTruck JTic~e!
%.~..-Z~ORE , ,, zo? ! 427858
Mix Numoer JM[x Descnpdon
i
W(~,(~ EU~ ~ikd ' t:; o" ' ,Am c~ie_,m T em:>erature
i '95 i '92
PI~:~M , 0.0 GALS
iPhysical Data
ACTUAL ' - SPECIFICATIONS
SLUMP (in.) 5 Z/2
I
I
Ooncrete GyJinder Test(s)
AC/UAL SPECIFICATIONS
!Specimen ~ Age I Tot Loaa I Comoresswe 5'treng'c'~ S~rsncj"~ Re~uirec!
No. ! (Days) Test, Date i
~ I ' j
184 ? 09/07/93 ?~000 2690 3000
185 28 09/28/93
186 28 09/28/93 '
187 HOLD HOLD
eu~ngMemo~ jT~-~e~o~ st~n~-ds'x~- !'='~g'n~t~~WHITE (RONE) J
~ea 28~7 sq. ~ j j,
J~ C 3~ IA~M C 39
K. A. SPaS CONT~CTORS, INC./E. J. WILLIES ([), S.H.W.Z.N.C./
MIKE E~ORE (1), S.H.W.I.N.C./JOE C~DDOCK, V.P. (1),
K. A. SPaS CONT~CTORS, [NC./E.J.WZLL[~S ([)
Ro. s.¢.e.,s RoneE rineers
Geotechnical Consultants
Matedais Testing
Concrete Cylinder Test Report
Proiect IPurcnase
TOWN CENTER ELEMENTARY - COPPELL, TE~S
N~r " {~te of O~e~on {~ ~e
{ D3-080C-01-23778 ~ AUGUST 5, 1993 } SEPT. 9, 1993
COPPELL I.S.D.
G~DE B~ ~ C~19
{ ~oc
{ K. A. SPaS CONT~CTORS, INC.
{SupPer {P~ ~T~ck J~cket
~TTIMORE , ~ 128
{W~er ~ndifions
P~TL~ CLOUD~ '; 9 5 ~ 9 5
I !
. { 0.0 G~S
Physical Data
. ACTUAL SPEC}FiCA~ONS
SL~P (in.) 5
,Co~crete Cy{{Rder Test(s)
AC~AL SP EC{F{CAT{ONS
[ S~men Age { Tot Load { ~mpr~Ne ~n~ S~o~ R~uir~
122 7 08/12/93 90500 3200 3000
123 28 09/02/93 119000 4210
124 28 09/02/93 110000 3890 '
125 HOLD HOLD
Ounng Memod Test Me~o<~ iSt~n¢ard s' x ~ ~gi~r~O~
I
28~7
AS~ C 31 }A~M C 39 {~ea
R~s ~d/or ~on -
COPPELL I.S.D./MICKEY ~ER (1), CITY OF COPPELL/~Y DAVIS (1),
K. A. SPaS CONT~CTORS, INC./E. J. WILLIES (1), S.H.W.I.N.C./
MIKE E~ORE (1), S.H.W.I.N.C./JOE C~DDOCK, V.P. (1), :
K. A. SPaS CONT~ORS, INC./E.J.WILLI~S (1)
{,
I'.
Rone