REPORT OF
STRUCTURAL STEEL ERECTION INSPECTION
Project: Coppell Elementary School Addition Report No: 2660-3
Coppell, TX Attention: Mr. Tom Cypert
Client: Rone Engineers, Inc. Date of Service: 7-14,7-23,
& 7-21-93
11234 Goodnight Lane Page 1 of 1
Dallas, TX 75229
REPORT OF INSPECTION
Drawings utilized: Contract Documents
Locations/item inspected: Roof level, area A, B, & C. Metal roof deck spot
welds. Reinspection of #2622-3, dated 06-22-93.
Discrepancies/Comments:
Reinspection of report #2622-3, dated 06-22-93:
Item #lb - Deck not welded on 6" centers at center supports.
Center supports now properly welded on 6" centers. Side lap
screws have been installed.
Inspection on 07-14-93:
Numerous end laps not fused to supports. We were requested to
reinspect these end lap spot welds on 07-21-93.
Inspection on 07-21-93:
After this inspection it was noted that the erector still had
not properly welded the end laps. We were requested to perform
our next reinspection on 07-23-93.
Deck now properly welded. _
try eel, CWI #891
~~W~?~ract Inspection Service
This report is for the exclusive use of our client and shall mot ~~repr0duced without written approval from said client