SC-Town Center E8-LR 930817Rune Engineers Rune 'neers
Geotechnical Consultants
Materials Testing
Field Moisture/Density Test Report
Proiect
TOWN CENTER ELEMENTARY - COPPELL, TEXAS Purchase Order
Number I Samole Date IReoort Date
D3080C-01-23763_ i AUGUST 5, 1993 I AUGUST 17, 1993
To
COPPELL I. S. D.
Receivea From Technician
E.J. WILLIAMS TED NICHOLAS (RONE)
Test i :,/1o,sr. ure Content (%) Density (pcfJ Percent
~o.i Location F:eld i OI3timum Proctor Fie,d ' Density
i ,
50 8" SEWER LIN~- NO END OF 29.0 24.7 93.7 90.0 96.0
PROJECT WEST OF
HEARTZ RD 25'W OF 1ST M.H
LIFT/DEPTH 6. ' BELOW FN
MATERIAL DK GR CLAY
51 8" SEWER LINE NO END OF 27.0 24.7 93.7 91.8 98.0
PROJECT WEST OF HEARTZ RD
75' W OF 1ST M.H.
LIFT/DEPTH 3.' BELOW FN
MATERIAL DK GRAY CLAY
Tes~l~)dD 698 D 2922 D 3017 Material
Remarks and/or Distribution
COPPELL I.S.D./MICKEY HARPER (1), CITY OF COPPELL/LARRY DAVIS (1),
K. A. SPAI~KS CONTRACTORS, INC./E. J. WILLIAMS (1), S.H.W. I.N.C./
MIKE ELMORE (1), S.H.W. I.N.C./JOE CRADDOCK, V.P. (1),
K. A. SPARKS CONTRACTORS, INC./E.J.WILLIAMS (
Rone EnCeers
LIMITATIONS: The teat recruits presented harem were prep&red ~aseo uDOn the s~fic samol~ oro~d~ for t~tlng. We ~sume no r~nSlblli~ for
varlaUO~ ~ OUall~ (comDosl~O~. aD~ance. ~e~ormance. etc.: Of ~ny other 'eature of similac suOi~t me,er Drov,o~ by ~ns or conditions over which
we nave ~ control Cur ~e~em ~ ,e~ are for the exclusl~ use of the c!ien~ to whom th~ are addr~a.
Rone Eng'i.eers RoneE n 'ineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Project IPurchase OrOer
I
TOWN CENTER ELEMENTARY - COPPF. r.?.,
Number " Date of OOserva~on IReport Date
D3-080C-01-23403 ,TTTT.Y lq, 1993 I AUGUST !7, ~993
To
COPPELL I . S . D.
Loca~on
PIERS B6G, B5G
K. A. SPARKS CONTRACTORS, INC.
P'.ant IT~uck Ticket
Suppler
LATTIMORE 7 ~ 41 0 ~ 3 '~ '~ R
MM NumOer IMM Descfip~on
16
ceather CondiUons ,IAmi~e,"Tt Temperature ¢'F) Icor~crete Temperature (°~
LEAR I 92 I, 9O
:00 PM 0.0 GALS .
IPhysical Data
. ACTUAL' '- SPECIFICATIONS
SLUMP ( in. ) 4
Concrete Oylir]de~ Tes~(s)
ACTUAL SP.cC~FICAT]ONS
Specimeni Age i TotLoaO
No. (Days) T~ ~te Cbs.)
I I I I
59 7 07/26/93 74203 2620 3000
60 28
6~ 28 08/~6/93 ~7000 4~40
Curing Method j'rest Me.od Stanoard 6' x 12' [Engineer/Tecnnician
ASTMC. 31/iASTMC39 AJ'ea28.2.Tsq. in. I GEORGE BEALL (RONE) "
Remanks and/or Disln'oution
COPPELL I.S.D./MICKEY HARPER (1), CITY OF COPPELL/LARRY DAVIS (1),
K. A. SPARKS CONTRACTORS, INC./E. J. WILLIAMS (1), S.H.W.I.N.C./
MIKE ELMORE (1), S.H.W.I.N.C./JOE CRADDOCK, V.P. (1),
K. A. SPARKS CONTRACTORS, INC./E.J.WILLIAMS (1)
Rone E~g s
Rone Engineers RoneE ineers
Geotechnical Consultants
Ma[edals Testing
Concrete Cylinder Test Report
Project JPurchase
TOWN CENTER ELEMENTARY - COPPELL, TF. XAR J.
Numi:~r ,: ID~te oJ O~erv~on Repo~ Da~e
D3-080C-01-23798 IAUC. U.~T 6, 19q~ I AUGU.qT 17, 1993
To
COPPELL I . $ . D .
boca§on
SLAB ON GRADE SIDE WALK AT NORTH SIDE OF BUI?,m?NC- ~ [4A]~r3T-("AP I~AMP.~
Conumctor
K. A. SPARKS CONTRACTORS, INC.
Sup,~er Pla~, Tru¢.~ J"'l-~k et
TXI ! 43 179 ~ 19q9~.4
Mix Numoer tMix Desc..~pt~on
8272 J
WeafJ'ter Conditions JAmbiem Temperature (e~ JConcrete Temperature
CT.OOZY 'l 84 .J 77
Time SamDled J Water Adoed
10r. 20 AM ~ 0.0 GALS
Physical Data
ACTUAL ' " j SPECIFICATIONS
, SL~ (in.)- 5 1/2
AIR ENTRAINMENT (%) 4.9
Concrete Cylinder/est(s)
ACTUAL I SPECIFICATIONS
No. (Da~s) Test Date (ll~s.) (pso (psO
126 7 08/13/93 72000 2550 3000
127 28 09/03/93 :
128 28 09/03/93
129 HOLD HOLD
Curing Met.hod j'Test Method Jsta~dard ~' x 1~' Engineer/Technician
ASTM C 31'IASTM C 3S J~ea 2S~27 sq. k~ JEFF VANBLARICOM
Rereads a~d/or Dism'oulion - J
COPPELL I.S.D./MICKEY HARPER (1), CITY OF COPPELL/LARRY DAVIS (1),
K. A. SPARKS CONTRACTORS, INC./E. J. WILLIAMS (1), S.H.W.I.N.C./
MIKE ELMORE (1), S.H.W.I.N.C./JOE CRADDOCK, V.P. (1),
K. A. SPARKS CONTRACTORS, INC./E.J.WILLIAMS (1)
· -
Rone Engineem
~. nav~ n~ C~nG'04.