Loading...
SC-Town Center E8-LR 930813Rone Engineers RoneEnoineers Geotechnical Consultants Materials Testing Drilled Pier Report Project IPurchase Order TOWN OENTER ELEMENTARY - COPPELL, TEXAS N~nber Date of Observation Report Date D3-080C-01-23559 JULY 26, 1993 AUGUST 13, 1993 To COPPELL I · S. D. Bullring/S tructure En~neer / Technician AREA C GEORGE BEALL (RONE) SPECIFICATIONS ACTUAL I Shaft I PenetmUon Foot- Shaft Oepthto ! PenetraUon Total Test Pier No Diameter Diameter Beadng Depth No th.) . (fL) note (in.) Stratum(ft.) ti'L) (fL) ~ I I 0292 C9A 24 3.0 24 20.0 3.6 23.6 0293 C7.5B. 2 18 4.0 18 20.0 4.5 24.5 0294 CSA 24 3.0 24 20.0 3.6 23.6 0295 C7.5C 18 4.0 18 20.0 4.0 24.0 0296 C7.5D.2 18 5.0 18 20.0 5.5 25.5 0297 C7.5E 18 4.0 18 20.4 4.6 25.0 0298 B9.1F 30 4.0 30 20.5 4.5 25.0 0299 C9B 24 5.0 24 20.0 5.4 25.4 0300 CSB 24 5.0 24 20.0 5.0 25.0 0301 C8C 24 6.0 24 20.0 6.4 26.4 0302 BB. 5E 18 3.0 18 20.5 3.5 24.0 0303 C8.5D.2 18 4.0 18 20.6 4.8 25.4 0304 C9C 24 5.0 24 20.0 5.0 25.0 0305 C8.5C 18 3.0 18 20.6 4.9 25.5 Remarks and/or Distribution Notes: Depths are measured from top of ground surface u~less otherwise spedfled. Pe~et, aUon denotes ~%stance drilled ~to I~. amg stm fi. re. COPPELL I.S.D./MICKEY HARPER (1), CITY OF COPPELL/LARRY DAVIS (1), K. a. SPARKS CONTRACTORS, INC./E. J. WILLIAMS (1), S.H.W.I.N.C./ MIKE ELMORE (1), S.H.W.I.N.C./JOE CRADDOCK, V.P. (1), K. A. SPARKS CONTRACTORS, INC. / E. J. WILLIAMS (1) BEARING MATERIAL: DARK GRAY SHAT.F. AT.T, PIFRS WERE T~PC~ILY CASED REINFOR~G ST~. WAS IN ACCORDANCE WITH T~R .~.. SPECIFICATIONS U.N.O. AT.T. PTF~S WERE PLUMB, CLEAN AND DRY U.N.O.~'-'~one Engineers UMITAT)ON-~: We ~ssume no responsibility roi' variation In quau~ (composition. aD~.;earmmcs. I:;edomla.qce, e~.) O~ am,, O~ler fea~u~ of similar SuOlect mattel p~e~l by ~r~olYJ or cortdltJorm ~ wh~Gh w~ hm~ no cOntTQI. Our leffe~ arid reporm are for ~le ezclulive use Ot clle~t~ ~ who.1 ~hey are addressed. Rone Engineers Rone 'neers Geotechnical Consultants Materials Testing Drilled Pier Report Project IPurcflase Order TOWN OENTER ELEMENTARY - COPPELL, TEXAS Number Date of Observation Report Date D3-080C-01-23527 JULY 23, 1993 AUGUST 13, 1993 To COPPELL I · S. D. Build. g/S tructure Engineer / Technician AREA B & C GEORGE BEALL (RONE) SPECIFICATIONS I ACTUAL J Shaft Penetration Foot- J Shaft Depth to Total - P enetra [ion Test Pier No Diameter Diameter Bearhg Degth No ( ft. ) note J ( fL ) j (k) (in.) Stratum(ft) (fL) 0290 B9E. 7 18 4.0 18 20.5 4.5 25.0 0291 BllJ. 1 18 5.0 18 20.0 5.5 25.5 Remarks and/or Distribution Notes: Oel~ths are measured from top of ground surface unless otherwise spedfied. Penetration denotes c~tance ddlled hto bearhg stratun~ COPPELL I.S.D./MICKEY HARPER (1), CITY OF COPPELL/LARRY DAVIS (1), K. A. SPARKS CONTRACTORS, INC./E. J. WILLIAMS (1), S.H.W.I.N.C./ MIKE ELMORE (1), S.H.W.I.N.C./JOE CRADDOCK, V.P. (1), K. A. SPARKS CONTRACTORS, INC./E.J.WILLIAMS (1) one ~ Engineers LJMITAT]~NS: We assume no re~oonslbfflty for ve/JalJofl in qu~Jlty (camoos,flon, aouearance, oen(ormance, etc.) or any olhes' feature of .limllar subject ma~-r