Loading...
SC-Town Center E8-LR 930805Rone Engineers RoneE ineers Geotechnical Consultants Materials Testing Drilled Pier Report Project Purchase Order COPPEAL ELEMENTARY SCHOOL ~ 7 N~nber IDate of Observation Report Date D3-080C-01-23582 I JULY 27, 1993 AUGUST 5, 1993 To COPPELL I. S. D · E)uil(3'~ng / Structure Engineer / Technician AREA B & C GEORGE BEALL (RONE) SPECIFICATIONS I ACTUAL Shaft I Shaft I Depthto I Toiml Penetration Foot- Penetration Test Pier No Diameter Diameter I Bearing Depth No (h.) (irt) note (in.) ] S Ira tu'rn( ft- ) (irt.) (ft.) I 0312 C9.5A.5 18 3.0 18 20.6 4.4 25.0 0313 C8.5A.5 18 3.0 18 20.0 3.7 23.7 0314 B7K 24 3.0 24 20.0 3.5 23.5 0315 C7.5A.5 18 5.0 18 20.6 5.6 26.2 0316 B10L 24 4.0 24 20.0 4.5 24.5 0317 C8.5B. 2 18 3.0 18 20.6 4.8 25.4 0318 C2.5J 18 4.0 18 20.0 4.5 24.5 0319 C6.8D.2 24 5.0 24 20.0 5.2 25.2 0320 C6.8C. 8 24 5.0 24 20.0 5.0 25.0 0321 C9.5C. 5 18 3.0 18 20.4 3.4 23.8 0322 C10.5A 18 5.0 18 20.4 5.4 25.8 0323 C10.5B.2 18 4.0 18 20.3 4.5 24.8 0324 Ci0.5E 18 4.0 18 20.4 4.6 25.0 0325 C10.8C. 5 18 4.0 18 20.6 4.8 25.4 Re. tanks and/or Distribution Notes: Depths are measured from top of ground surface unless otherwise specified. Penetration denotes c,~stance dn'lled into bearing stratLxn. COPPELL I.S.D./MICKEY HARPER (1), CITY OF COPPELL/LARRY DAVIS (1), K. A. SPARKS CONTRACTORS, INC./E. J. WILLIAMS (1), S.H.W.I.N.C./ MIKE ELMORE (1), S.H.W.I.N.C./JOE CRADDOCK, V.P. (1), K. A. SPARKS CONTRACTORS, INC. / E. J. WILLIAMS (1) BEARING MATERIAL: DARK GRAY SHAT.W. ALT. PIERS WERE TEMPORAR~Y CASED REINFORCING ST~-~. WAS IN ACOORDANCE WITH PROJECT SPECIFICATIONS U.N.O. ~ PTRRS .WERE CL~.AN, PLUMB AND DRY U.N.O.~Ro~/ne Engineers I !MITA'r~)NS: We a~sume rio resDons;b~lity for venal]on in quality (comDosil]on, aopea,-arlce, perform~lce, e~c.) or any olhet' feature of sint;laJ' SUOleCt Rune Engineers RoneE naineer s Geotechnical Consultants il Materials Testing Drilled Pier Report Project Purchase Order COPPET~L ELEMENTARY SCHOOL ~ 7 Number Date of Observation Report Date D3-080C-01-23582 JULY 27, 1993 AUGUST 5, 1993 To COPPELL I · S · D · Builo'ng/S tructure Encjheer / T echnician AREA B & C ! GEORGE BEALL (RONE) SPECIFICATIONS i ACTUAL Test I Shaft Penetration Foot- Shaft I Depth to Penetraticn Total I Pier No Diameter DiameterI Bearing (ft.) Depth (~.} (ft) note (in.) . S [:ra turn(ft.) (ft) No I 0326 C9.5B.2 18 3.0 18 20.3 3.3 23.6 0327 C9. SD. 2 18 4.0 18 20.3 4.4 24.7 0328 C10.5C. 5 18 5.0 18 20.1 5.3 25.4 Remarks and/or Distribution Notes: Depths are measured from top of gro~d surface ~less otherwise spedF~ed. Penetration denotes ds[ance ddlled btu bearing stratun~ COPPELL I.S.D./MICKEY HARPER (1), CITY OF COPPELL/LARRY DAVIS (1), K. A. SPARKS CONTRACTORS, INC./E. J. WILLIAMS (1), S.H.W.I.N.C./ MIKE ELMORE (1), S.H.W.I.N.C./JOE CRADDOCK, V.P. (1), K. A. SPARKS CONTRACTORS, INC./E.J.WILLIAMS (1) ne Engineers I'M TAT~DNS We as ..... o re~pons,hlllt~ fo .... ~on ,n quality (com~s,tlom. aO~earance, i~erfoqnmnc.., e,¢.) O, ~ .other feature 0f.~s!.m~ra~e ~reecs~s~t~