Loading...
Shadowridge P1-3-CS 890804GINN, INC. CONSULTING ENGINEERS August 4, 1989 Mr. Russe/Doyle, P.E. City of ~oppell P.O. Bo~ 478 Coppe~_ ,_TX 75019 Re:/Shadow Ridge Estates, First Increment Replat (Lot 33, Block A) Construction Plans Dear Mr. Doyle: We have reviewed the plans for the above referenced project and have no objections with regards to the proposed water and sewer layout. ~ Sincerely, Gabe Favre GF/dsp cc: Benjamin dela Cruz Sanford LaHue - Schrickel, Rollins and Assoc., Inc. H. Wayne Ginn, P.E. File 89305 17103 Preston Road ® Suite 100 ® LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 INC. : Box/478 ,i 11/ TX 75019 Re: P.E. Shadow Ridge Estates IV Construction Plans CONSULTING ENGINEER Dear Mr. Doyle: We have reviewed the construction plans for the above referenced project for conformance to City standards and offer the following comments. The visibility triangle, Bethel School Road at Plantation, should be 25'x25' not 22'x22' as shown, to match opposite corner. Harris Drive street dedicaticn should have Volume, Page numbers completed. Approval block for P&Z commission and Mayor should have correct date provided. Construction of Bethel School Road, escrow of monies, or escrow agreement needs to be addressed. Note on Sheet 3, "top of water line shall be no higher than 595.00" needs to be clarified (see drawings). 5. Minimum cover over water lines should be 36". On drainage plan, time of concentration should be 10 minutes, runoff coefficient ~bould be 0.45, "I" should be 11.6 in./hr, and calculation of "Q" would change. There is approximately 80 c.f.s, coming from west (Kaye Street area), which affects southwest portion of this project, that need~ to b~ addressed. The plan sheet depicting the alley geometrics (Sht. 5 of 8) needs to be in compliance with City standards. Width of alley tie to existing street should be 12'. Widening of alley pavement from i0' to 12' should occur on both sides of curve in alley. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/2484900 Sheet 5 of 8, Alley transition section: show existing sanitary sewer lines; show proposed manhole #1; show flowlines of culverts; show proposed Bethel School Road paving; verify storm sewer size of 18" RCP; show alley widths in compliance with standards; show thickness and widths of flumes and concrete slopes at culvert. Should you have any questions regarding the above comments or suggestions, please contact us. Sincerely, Gabe Favre GF/dsp cc: Ben dela Cruz Taryon Bowman Sanford LaHue, Schrickel, Rollins & Assoc. H. Wayne Ginn, P.E. John C. Karlsruher, P.E. File 89305-123 enclosure: set of marked-up plans