Loading...
SC-Town Center E8-LR 930723 (2) Rone Engineers RoneE ineers Geotechnical Consultants Materials Testing Drilled Pier Report P ro~::t IPurchase Order COPPELL ELEMENTARY SCHOOL # 7 Nu"nber Date of Observation Report Oate D3-080C-01-23054 JU~E 30, 1993 JULY 23, 1993 To COPPELL I . S . D. 8~'lc;ncJ/$ tructure En~g/neer / Technician GEORGE BEALL (RONE) SPECIFICATIONS ACTUAL Test I Shaft Penetration Foot- Sh~ft De!~th to I Total No Pier No I E)iameter Diameter Bear~gI Penetration (~) (ft) note (~.) Stratum(f!.) (ft.) Depth (ft.) I 0051 .~Z{-A8 18 4.0 18 20.1 4.3 24.4 Remarks and/or Distribution Notes: Depths are measured from top of grou'td surface unless otherwise specified. Penetration denotes dstance dh]led hto bearing stratum. COPPELL I.S.D./MICKEY HARPER (1), CITY OF COPPELL/LARRY DAVIS (1), K. A. SPARKS CONTRACTORS, INC./E. J. WILLIAMS (1), S.H.W.I.N.C./ MIKE ELMORE (1), $.H.W.I.N.C./JOE CRADDOCK, V.P. (1), K. A. SPARKS CONTRACTORS, INC./E.J.WILLIAMS (1) Rone Engineers LIMr~T~CNS. We assume ~ ~Dons~billty for vanagon in cluaJJl~