Loading...
Shadowridge P1-3-CS 890512The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 Hay 1.2, 1989 ~-~ ~:: eve Stolte Fox & .Jacobs .1660 South Stemmons Suite 150 DalIas, Texas 75067 RE: Water/Sewer Fees for Shadow Ridge Estates 1st Increment- Replat (3 lots) Dear Mr. Stolte: You will find that I' have calculated all water/sewer fees associated with the above mentioned project. These fees are listed below. Water Availability Fee: I'~;)r 3 lots @ $220.00 each 50% due prior to Council Approval '~t.~ due at time of Building Permit :;,~u,_~' Availability Fee: Ii'or 3 lots @ $220.00 each 50% due prior to Council Approval 50/o due at time of Building Permit Water Tap Fee: 'For 3 connections @ $100.00 each 100% due at time of Building Permit 'rap Fee: connections @ $100.00 each due at time of Building Permit $660.00 $330.00 * $330.00 $660.00 $330.00 * $330.00 $300.00 $300.00 iJtility Inspection Fee: buildings (lots) @ $75.00 each due at time of Building Permit $225.00 Fees due prior to approval of the plat by City Council. (:becks for payment of fees need to be made payable to the City of doppe]l and the name of the project and type of fee printed on the check. If you have any questions regarding these fees, please contact me at. 462-8495. S[?cerely, ~ ~ t Iloward L. Paff~-d ' Water Utilities Supervisor t[LP/bb Steve Goram, Director of Public Works Taryon Bowman, P & Z Coordinator Dale Jackson, Building Official