Shadowridge P1-3-CS 890512The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
Hay 1.2, 1989
~-~ ~:: eve Stolte
Fox & .Jacobs
.1660 South Stemmons
Suite 150
DalIas, Texas 75067
RE: Water/Sewer Fees for Shadow Ridge Estates 1st Increment- Replat
(3 lots)
Dear Mr. Stolte:
You will find that I' have calculated all water/sewer fees associated
with the above mentioned project. These fees are listed below.
Water Availability Fee:
I'~;)r 3 lots @ $220.00 each
50% due prior to Council Approval
'~t.~ due at time of Building Permit
:;,~u,_~' Availability Fee:
Ii'or 3 lots @ $220.00 each
50% due prior to Council Approval
50/o due at time of Building Permit
Water Tap Fee:
'For 3 connections @ $100.00 each
100% due at time of Building Permit
'rap Fee:
connections @ $100.00 each
due at time of Building Permit
$660.00
$330.00 *
$330.00
$660.00
$330.00 *
$330.00
$300.00
$300.00
iJtility Inspection Fee:
buildings (lots) @ $75.00 each
due at time of Building Permit
$225.00
Fees due prior to approval of the plat by City Council.
(:becks for payment of fees need to be made payable to the City of
doppe]l and the name of the project and type of fee printed on the
check.
If you have any questions regarding these fees, please contact me
at. 462-8495.
S[?cerely, ~ ~ t
Iloward L. Paff~-d '
Water Utilities Supervisor
t[LP/bb
Steve Goram, Director of Public Works
Taryon Bowman, P & Z Coordinator
Dale Jackson, Building Official