Loading...
SC-Lakeside E6-CS 930129SHW Group Inc January 29, 1993 Mr. Keith Jackson Cook-Jackson, Inc. P. O. Box 2728 Dallas, Texas 75221 RE: Lakeside Elementary School (Coppell Elementary School #6) Village Parkway Site Dear Mr. Jackson: I am writing this letter to confirm our telephone conversations of Friday, January 22 and Monday, January 25, 1993. The purpose of our conversations on those dates was to discuss what actions would be taken to correct the grading problems along the com- mon property lines between your client's and my client's land. On Friday I called the general contractor of the school project and requested a price to haul in and grade 500 cubic yards (quantity supplied by your letter dated January 20) of dirt along the north side of the school building. This would allow this area to drain properly according to our grading plan. The general contractors called me on Monday with the price which I relayed to you in our Monday conversation. This price was $3,600.00. At that time I in- dicated to you that the school district needed to know an answer from your client by Wednesday noon as to whether or not they were going to pay the $3,600.00. You indi- cated that you would get in contact with your client. This information was needed by Wednesday as this decision was delaying the general contractor since Friday, January 22. T.U. Electric has indicated that they will not set any switch gear pads on the ground until the grade at the area is resolved. Without T.U. Electric doing their work, permanent power cannot be brought into the building. The general contractor is needing power to start the mechanical equipment in order to move air to maintain the quality of certain finishes which are needing to be installed. Any further delays could result in the general contractor adding on additional costs to the price of $3,600.00. In order to keep these costs down I am directing the general contractor to proceed with grading operations at the switch gear pad locations so that permanent power may be installed as soon as possible. This will still leave the majority of the area in question ungraded at this time. Please notify me by the first of next week if your client is willing to pay the $3,600.00 to correct the hardship which has been placed on my client by your grades not allowing the water to flow properly off of my client's land. On Wednesday I indicated to you that I would need to contact the City of Coppell in or- der to keep them informed of what is going on and if they could help resolve this situa- tion. Mr. Keith Jackson January 29, 1993 Page Two I am anxiously waiting to hear from you early in the week next week. Should you have any questions, please do not hesitate to call. Sincerely, SHW Group, Inc. Michael L. Elmore Senior Associate ME/kc cc: Mr. Mickey Harper, Coppell I.S.D. Mr. Robed Howman, Ayres and Associates Mr. Ken Griffen, City of Coppell Mr. Larry Davis, City of Coppell