Loading...
SC-Lakeside E6-CS 920512SHW Group Inc May 12, 1992 Mr. Wilburn Echols, Jr., Superintendent Coppell Independent School District 200 S. Denton Tap Road Coppell, Texas 75019 RE: Coppell Elementary #6 Dear Mr. Echols: Enclosed please find letters from K. A. Sparks Contractor and his subcontractor referencing the costs of the work to be done in the City easements. This amount is $30,400.00 for this project. The City requires a fee of 2% of the cost of the construction in the easements for their inspection fee. Please issue a check to the City of Coppell in the amount of $608.00 for this requirement. If you could execute this check as soon as possible, the contractor may continue to work without any adjustments in scheduling. Please send a copy of the attached letters from the contractors along with your check to verify the costs. Should you have any questions, please do not hesitate to call. Sincerely, SHW Group, Inc. Michael L. Elmore Senior Associate ME/kc Enclosures P.O. Box 869 HAMILTON, TEXAS 76531 817-386-3181 May 5~ 1992 Mr. Mike Elmore S H W Group, Inc. P.O. Box 619087 Dallas, Texas 75261 RE: Coppell Elementary School #6 Dear Mike: The cost of the utilities which fall within the city's easement is $30, 400.00. Trusting this is the information you need. Sincerely, K. Ao Sparks Contractor, Inc. Jim Schooler President JS/js Attachment MEMO TO: .TTM .SC.H[ll]I FR i-';. A. -OF'~RI40 COr4TF{ACTOR INC. FROM~ ROBINSON ELEL:f~ICAL DATE: 4/30/92 COPPELL ELEMENTARY JIM, ~N REGARDS TO THE BREAKOUT OF WORK WITHIN THE CITY'S EASEMENTS, THE ESTIMATED PRICE IS ~30.~¢0~ I WAS NOT REAL SURE WHAT ALL TO INCLUDE, BUT THE ~OLLOWING IS A BASIC LIST OF WHAT IS INCLUDED IN THE ABOVE ESTIMATE: DOMESTIC WATER TAP, METER, VAULT, ETC. FIRE LINE TAPS, DECT. CHECKS, VAULTS, ETC. SPRINKLER METERS, TAPS, BOXES, & BACKFLOW PREV. ETC. SEWER TAP AND PVC TO EASEMENT LINE STORM SEWER TAP AND RCP TO THE EASEMENT LINE I.F YOU HAVE ANY ~UESTIONS, PLEASE CALL ME. ~:AROLYN