Shadowridge P1-3-CS 880803COPPELL PUBLIC WORKS MEMORANDUM August 3, 1988 FROM: RE: Steve Goram, Director of Public Per Birdsall, Streets Foreman ~ Plantation and Whispering Hills ~ ~ ~~ Wor T~-~D~_~ rep. airs. on _~b_ ~s~r~riDg Hil~and ~m_~P_lantation are-a~_~ Per- formance perEaznzng to drainage has not-- ~et been determine~. During the first rain the areas will be checked to determine if additional layers of asphalt will be needed. Four cubic yards and two cubic yards of a cement and sand slurry were poured into voids found beneath the pavement on Whispering Hills and on Plantation respectively. Twenty-two and twenty-eight tons of hot mix asphalt were applied to those locations respectively to fill the depressions to grade. Total cost for both temporary repairs was $1365.50 (materials). Ninety-seven manhours were used to make the repair and 17 manhours were used for clean-up. I would also like to note special thanks to Don Conklin of the Water Department who assisted at both locations. PHB/bb ~~' . . , i~ cc: Howard Pafford Don Conklin