Loading...
Shadowridge P1-3-CS 880623COPPELL PUBLIC WORKS MEMORANDUM June 23, 1988 TO: Steve Goram, Director of Public Works FROM: Per Birdsall, Street Foreman RE: Whispering Hills & Plantation Repair I have received price quotes for the two locations referenced above (attached). The price of the two together does not vary the cost since the repair on Plantation does not include curbing. The total for Whispering Hills is $16,031.91 which includes fill, compaction and 6% hydrated lime. The total for Plantation is $10,390.77 which includes the same. Not included in either quote, which together total $26,422.68, is the bond, soil testing, and concrete testing. For a temporary repair by a contractor, based on 5" average thickness of asphalt, I have estimated the cost not to exceed $8,600.00. I will be receiving an official quote tomorrow morning from Dallas County Asphalt, Inc.. If you have any questions, please advise. PHB/sm