Loading...
Shadowridge P1-3-CS 880601COPPELL PUBLIC WORKS HEMORANDUH June 1, 1988 TO: FROM: RE: Steve Goram, Director of Public Works Per Birdsall, Streets Foreman~ Whispering Hills, Plantation Temporary Repair The Street Dept. is planning to address the temporary repair of the two streets mentioned above. The roadway will require undersealing before asphalt is applied to the surface. It is not known at this time the extent of the void, which will be a factor in the cost of undersealing. I recommend that we remove a small section of pavement to view the condition of the subgrade. The cost of undersealing will affect other proposed contracted repairs mentioned in another memo; RE: Concrete/Drainage Repairs. Attached is a requisition which will require three written price quotes. The vendors will have to make on site analysis to make an estimate. Other conditions to facilitate this repair are weather and 910 being operational to haul asphalt. If you have any questions, please advise. PHB/bb Attachment