Loading...
Shadowridge P1-3-CS 880510COPPELL PUBLIC WORKS MEMORANDUM May 10, 1988 TO: FROM: RE: Steve Goram, Director of Public Works Per Birdsall, Streets Foreman Cost Estimate for Temporary Repair of Whispering Hills and Plantation Dr. (Tickler 5/12/88) Obvious subgrade failures are evident on Whispering Hills and Planta- tion Dr. in the Shadowridge Subdivision. Temporary repair of these streets are required before deterioration makes these streets impassable. Permanent repair, which would be impossible to undertake with existing resources, would involve reconstruction of a large area of the street, including recompaction of utility trenches and replacement of stabilized subgrade. The recommended temporary repairs would involve the undersealing of the affected pavement sections to prevent further settlement of the pavement structure and fill anticipated voids under yet unaffected pavement sections. After the undersealing is complete a level up course of hot mix asphalt will be applied on top of the concrete to restore curb drainage and rideability of the pavement. UNDERSEALING 4 days @ $1,040.00 30 cu yds grout @ $11.00/yd $4,160.00 $330.00 $4,490.00 ASPHALT 40 tons HMAC @ $27.00/ton delivered 55 gal RG2 @ $2.00/gal $1,080.00 $110.00 $1,190.00 Whispering Hills will require 70% of this cost. to temporarily repair both locations is $5,680.00. The total cost If you have any questions, please advise. PHB/bb