Loading...
Shadowridge P1-3-CS 851209The City With A Beautiful Future P. O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 December 9, Ig85 Mr. C. A. Daniels Lightning Construction Co. P.O. Box 176 Seagoville, TX 75159 RE: Shadowridge, Phase I, Project Dear Mr. Daniels: It has just recently been brought to my attention that there is a problem, which you are aware of, existing on Whispering Hills in the Shadowridge, Phase I Project. An on site inspection of the problem and an evaluation of the test reports supplied to me by our consulting engineer has supported the conclusion that there is a failure in compaction over the 8 inch water main which runs behind east back of the curb, and this is the cause of the crack now existing. It is also understood that the project maintenance bond will expire the 28th of this month and that this should be considered a formal notification that actions must be taken to rectify the mentioned problem Is). Your prompt attention to this matter is requested. Sincerely, Per Birdsall Street Foreman cc.' Steve Goram, Director of Public Works Randy Fleming, Chief Inspector Dino Ferralli, Engineer Harold Dixon, Gra-son Land Co.