Loading...
SC-Lee E2-CS 901213 CITY OF COPPELL PLanNING DEPARTHEh~ STAFF REPORT LEE ELEHI/NTARY SCHOOL - PRELIMINARY PLAT P & Z I/FARING DATE: December 13, 1990 C. C. HEARING DATE: 2anuary 8, 1991 LOCATION: Approxi~ately 633 feet north of Sandy Lake Road, along the ~est side of Samuel Boulevard. SIZE OF ARFA: 9.88 Acres REOUEST: Approval of a preliminary plat. APPLICANT: Coppell Independent Ayers & Assoc. (Engineers) School District 2110 Walnut Hill Lane 1201 Wrangler Drive Suite $134 Coppell, Texas 75019 Irving, Texas 75038 (214) 471-1111 (214) 570-5577 HISTORY: There has not been a great deal of recent zoning activity in the area, although property iemediately south of this parcel has been granted a Special Use Permit for a Food Lion food store, and plat activity to create a church site was recently approved adjacent to the school. TRANSPORTATION: Samuel Boulevard has been improved to standard. Sandy Lake Road is on the thoroughfare plan as a slx-lane divided highway; today it is a two-lane road. SURROUNDING LAND USE & ZONING: North - Neado~ Ridge condos on "HF-2' zoned land East - The Woods subdivision on 'PD-SF-9' zoned land; St. Ann's Catholic Church on 'SF-9' zoning South - Vacant, 'C' zoning, although the Coppell Church of Christ and a Food Lion food store are planned for construction West - Single-fa~ily residence on 'SF-12' zoned land COHPREBENSIVE PLAN: The Co~prehensive Plan sho~s the parcel as being utilized for an elementary school. ANALYSIS: Because the property has already been developed for a school, staff would recommend that this plat be approve. In essence, the school district is interested in expanding Lee Elementary by adding a nine classroom, six teacher workroom addition. The procurement of a building permit is conditioned upon the property being platted; hence, the request before you here. We are also reviewing a final plat for this property, and are assured that conditions for final plat approval will be complied with by the applicant. All plat application fees need to be paid before any construction work is done. ALTERNATIVES: 1) Approve the preliminary plat 2) Deny the preliminary plat ATTACHMENTS: 1) PreliminaryPlat LEEPSTF