Loading...
Shadowridge P1-3-CS 851007GINN, INC. CONSULTING ENGINEERS October ?, 1985 Mr. Harold Dixon GRA-Son Land, Inc. Dallas, TX Re: Shadowridge Estates Phase II - Final Accep Dear Mr. Dixon: A final inspection of the above referenced project has been confirmed by representatives of Ginn, Inc. and the City of Coppe11. The utility and paving requirements are in compliance with standard requirements and are acceptable to the City of Coppe11. As of this date, permits can be issued to start construction of home building within the limits of this phase. As-built drawings and one-year maintenance bonds have been received from both contractors. Maturity of the bonds will be one year from the date of this letter. Also, commitments to the streetscape-landscape plan should be addressed shortly hereafter. Sincerely, H. wayne Ginn, P.E. City Engineer RF/HWG/sr cc: Steve Goram L.H. Lacy Co. R.S. Ross, Inc. Building InspeCtion Dept. Randy Fleming 161~,5 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611 Contractors to Shadowridge Phase II= L.H. Lacy Co. 10888 Shady Trail P.O. Box 20297 Dallas, TX 75220 214/357-0146 R. S. Ross, Inc. (R&B Utilities) 4222 Rosehill Road, %10 Garland, TX 75043 214/271-3629