Loading...
SC-Lee E2-CS 870326March 26, ~987 ~g~,IORANDUN TO: Alan D. Ratliff, City Hanager FRON: Steve Morton, Chief Land Development Inspector RE: Lee Elementary I have been asked to research the question of no sidewalks in front of Lee Elementary, located on Samuel Boulevard in Coppell. At the time that Lee Elementary was constructed, Samuel Boulevard was an existing asphalt road. As of this date, I have been unable to locate the construction plans for Lee Elementary. I have, however, located the as-built plans, which are on file in the Department of Public Works, for Samuel Boulevard Improvements. These plans were approved by Wayne Cinn, with no provision for sidewalks. Ny only susEestion would be to have the Coppell Independent School District assessed for sidewalks, or have the School District construct the sidewalks to avoid any extra expense to the City when the wideninE of Samuel Boulevard is completed. If you have any further questions, please let me know. cc: Y~aukTtamlo - Vivyon Bowman ~ LEE ELEH. PZAGN