SC-Mockingbird E4-CS 920108January 8, 1992
Mr. E. J. Williams
K. A. Sparks Contractors, Inc.
P. O. Box 869
Hamilton, TX 76531
Re: Coppell Elementary (Mockingbird)
Final Acceptance
Dear Mr. Williams:
A final inspection of the above referenced project has been confirmed by
representatives of the City of Coppell.
Paving and utilities have been verified and are in compliance with the
City of Coppell standard requirements.
Please follow the Erosion Control Ordinance as adopted by the City of
Coppell during the maintenance bond period.
The one-year maintenance bonds and as-built drawings have been received
from the contractor. Maturity on the bonds will be one year from the date
of this letter (January 8, 1993).
Engineering Development Inspector
CLD/bd
cc: Kenneth M. Griffin, P.E., City Engineer
M. Shohre Daneshmand, P.E., Civil Engineer
Gary L. Sieb, Director of Planning and Community Services
Howard Pafford, Water Superintendent
Rey Gonzales, Street Superintendent
Rick Wieland, Parks and Recreation Manager
?aryon Bowman, P & Z Coordinator
Ben dela Cruz, Engineer Technician
Mike Elmore, S}II~C Inc. Architects
Mick¥ Harper, Coppell Independent School District