Loading...
SC-Pinkerton E1-CS 950703 COPPELL INDEPENDENT SCHOOL DISTRICT RICH~D D. (~CK~) HARP~ Se~ce Center 1214) ~3-~77 DIRE~OR OF MAINT~CE 2~ Southwe~em BNd. (214) ~2-1832 Cop~ll,~sT~19 DATE: JULY 3, 1995 TO: KEN GRIFFIN CITY ENGINEER/ASST. CITY MANAGER FROM: MICKEY HARPER~~-~ DIRECTOR OF MAINTENANC~ SUBJECT: PAVING CHANGE IN OUR ORIGINAL PLANS WE SHOW THE USE OF LIME STABILIZATION ON THE PARKING LOT AND DRIVE THAT WE ARE ADDING AT 268 SOUTHWESTERN BLVD. WE HAVE SINCE LEARNED THAT THE COST OF THE LIME STABILIZATION ALONE WOULD BE MORE THAN WHAT WE HAD ESTIMATED IT WOULD COST FOR LIME STABILIZATION AND CONCRETE. SINCE THE COST IS SO GREAT WE WOULD LIKE TO CHANGE AND USE 7 INCHES OF CONCRETE ON THE FIRE LANES AND 5 INCHES OF CONCRETE ON THE PARKING LOT INSTEAD OF THE LIME STABILIZATION. THE CONCRETE USED WILL BE A 4000 PSI 6 SACK MIX. ENCLOSED IS A NEW SET OF DRAWINGS WITH THE 8 INCHES OF CONCRETE SHOWN. I DISCUSSED THIS MATTER WITH GARRETH CAMPBELL AND HE ADVISED ME THAT THIS SUBSTITUTION IS SOMETHING THAT THE CITY ALLOWS. THE DISTRICT IS DOING ALL OF THE WORK POSSIBLE ON THIS JOB AND THIS CHANGE WOULD SAVE US SOME MONEY AND TIME. YOUR ASSISTANCE ON THIS MATTER WILL BE GREATLY APPRECIATED. IF YOU HAVE ANY QUESTIONS PLEASE GIVE ME A CALL AT 393-3047. Teaching and Leaming Together...