Loading...
Sherwood Park 2-LR 841116PROJECT OBSERVATION R~PORT JOB NUMBER 153.25 JOB TITLE CONTRACTOR M. 0:~. ~~on PIERCE-LUNSFORD Sherwood Park II ASSOCIATES, INC. DATE 11-16-84 LOCATION Coppell WORK PERFORMED T~IS DATE Contractor ~r testing all sanitary lines. Contractor passed all lines on first try, except line "L" frc~ 5 + 42 to 2 + 74. Contractor located leak in sanitary service plug located at Lot 33 Nixon Drive. Contractor retested ar~ passed. Leakage on _ lines was less than ¼ pound~ ~ per s~e inch Co~tractor pulled off job and removed equi~t late this afernoon. Contractor collected water sample for lab _ evaluation this date. REMARKS OFFICIAL VISITORS ON JOB WEATHER Clear _ HOURS WORKED SIGNATURE TEMPERATURE TO 5: NN PIEF CF::-LUNSFOFIE) ASSOClATF::S, INO. CONSULTING ENGINEEFIS SANITARY SEWER AIR TEST REPORT Ref.# 153.25 Contractor Client Line L Approximate Linear Feet Pipe Diameter Project Name M.~.~truction Cop~ell M.U.D. Sta. 10 + 00 452 Required Time Starting Time Initial Pressure Passed X 5:43 3:20 3.5 psi. Sherwood Park II to Date 11-16-84 Sra. 5 + 48 Actual Time 15:00 Finishing Time 3:35 Final Pressure 3.25 Failed Comments l~Si · Line L Sra. 5 + 48 Approximate Linear Feet 274 Pipe Diameter 8" Required Time 3:48 Starting Time 4:15 Initial Pressure 3.25 Passed X psi. to Sta. 2 + 74 Actual Time .5:00 Finishing Time 4:20 Final Pressure 3.25 psi. Failed Comments * Note ~nis line failed on first tr~, but leak ~s located and corrected. Signature projec~bse~rver v PII F::I I=-LUNSFOF:::I[D ASSOOIATIEEL INC. CONSULTING ENGINEEFIS SANITARY SEWER AIR TEST REPORT Ref.% 153.25 Contractor Client Line M Approximate Linear Feet Project Name S~Park II M. Co. Construction Coppell M.U.D. #1 : Sta. 0+00 to 315 Pipe Diameter Required Time Starting Time Initial Pressure Passed X ....... Comments 11 2:50 2:30 3.5 psi. Date 11-16-84 Sra. 3 + 15 Actual Time 4:00 Finishing Time 2:34 Final Pressure 3.5 Failed · psi. Line L Sta. Approximate Linear Feet Pipe Diameter 8" Required Time 4:26 Starting Time 3:00 Initial Pressure 3.5 Passed X ........... Comments 13 + 10 to Sta. 10 + 00 310 Actual Time 5:00 Finishing Time 3:05 _ psi. Final Pressure 3.25 psi. Failed Signature ~lJ~~ Project ~bserver PIEF:::ICE-LUNSFORE) ASSOCIATES, INC. CONSULTING ENGINEERS SANITARY SEWER AIR TEST REPORT Ref.% 153.25 Project Name Contractor M. Co. Construction Client Coppell M.U.D. 2+85 285 Sherwood Park II .pSi. to Date 11-16-84 Sra. 0 + 00 Actual Time Finishing Time Final Pressure Failed .psi. Line L-1 " Sra. Approximate Linear Feet Pipe Diameter 8": Required Time 3:48 Starting Time * Initial Pressure * Passed X Comments , Note: Pierce-Lunsford Associates was not present durin~ testing of this line. Paul Lusk with Ginn Inc. observed & passed this line. Line S Sra. 0 + 00 Approximate Linear Feet 170 PiDe Diameter 6" Required Time 2:50 Starting Time * Initial Pressure * psi. Passed X * Comments Note: to Sra. 1 + 70 Actual Time Finishing Time Final Pressure psi · Failed Pierce-Linsford Associat-~-~- was not present during the ~stin~ ~f this line. Paul Lusk with Ginn Inc. ,:observed and passed this _ P'ro J e~ft- Observer fr ~[ II I _ I