Sherwood Park 2-LR 841116PROJECT OBSERVATION R~PORT
JOB NUMBER 153.25 JOB TITLE
CONTRACTOR M. 0:~. ~~on
PIERCE-LUNSFORD
Sherwood Park II
ASSOCIATES, INC.
DATE 11-16-84
LOCATION Coppell
WORK PERFORMED T~IS DATE
Contractor ~r testing all sanitary lines. Contractor passed all lines on first try,
except line "L" frc~ 5 + 42 to 2 + 74. Contractor located leak in sanitary service
plug located at Lot 33 Nixon Drive. Contractor retested ar~ passed. Leakage on _
lines was less than ¼ pound~ ~ per s~e inch Co~tractor pulled off job and
removed equi~t late this afernoon. Contractor collected water sample for lab _
evaluation this date.
REMARKS
OFFICIAL VISITORS ON JOB
WEATHER Clear _
HOURS
WORKED
SIGNATURE
TEMPERATURE
TO 5: NN
PIEF CF::-LUNSFOFIE) ASSOClATF::S, INO.
CONSULTING ENGINEEFIS
SANITARY SEWER AIR TEST REPORT
Ref.# 153.25
Contractor
Client
Line L
Approximate Linear Feet
Pipe Diameter
Project Name
M.~.~truction
Cop~ell M.U.D.
Sta. 10 + 00
452
Required Time
Starting Time
Initial Pressure
Passed X
5:43
3:20
3.5 psi.
Sherwood Park II
to
Date 11-16-84
Sra. 5 + 48
Actual Time 15:00
Finishing Time 3:35
Final Pressure 3.25
Failed
Comments
l~Si ·
Line L Sra. 5 + 48
Approximate Linear Feet 274
Pipe Diameter 8"
Required Time 3:48
Starting Time 4:15
Initial Pressure 3.25
Passed X
psi.
to Sta. 2 + 74
Actual Time .5:00
Finishing Time 4:20
Final Pressure 3.25
psi.
Failed
Comments * Note ~nis line failed on first tr~, but leak ~s
located and corrected.
Signature
projec~bse~rver v
PII F::I I=-LUNSFOF:::I[D ASSOOIATIEEL INC.
CONSULTING ENGINEEFIS
SANITARY SEWER AIR TEST REPORT
Ref.% 153.25
Contractor
Client
Line M
Approximate Linear Feet
Project Name S~Park II
M. Co. Construction
Coppell M.U.D. #1
: Sta. 0+00 to
315
Pipe Diameter
Required Time
Starting Time
Initial Pressure
Passed X .......
Comments
11
2:50
2:30
3.5 psi.
Date 11-16-84
Sra. 3 + 15
Actual Time 4:00
Finishing Time 2:34
Final Pressure 3.5
Failed ·
psi.
Line L Sta.
Approximate Linear Feet
Pipe Diameter 8"
Required Time 4:26
Starting Time 3:00
Initial Pressure 3.5
Passed X ...........
Comments
13 + 10 to Sta. 10 + 00
310
Actual Time 5:00
Finishing Time 3:05 _
psi. Final Pressure 3.25 psi.
Failed
Signature ~lJ~~
Project ~bserver
PIEF:::ICE-LUNSFORE) ASSOCIATES, INC.
CONSULTING ENGINEERS
SANITARY SEWER AIR TEST REPORT
Ref.% 153.25 Project Name
Contractor M. Co. Construction
Client Coppell M.U.D.
2+85
285
Sherwood Park II
.pSi.
to
Date 11-16-84
Sra. 0 + 00
Actual Time
Finishing Time
Final Pressure
Failed
.psi.
Line L-1 " Sra.
Approximate Linear Feet
Pipe Diameter 8":
Required Time 3:48
Starting Time *
Initial Pressure *
Passed X
Comments ,
Note: Pierce-Lunsford Associates was not present durin~ testing
of this line. Paul Lusk with Ginn Inc. observed & passed this line.
Line S Sra. 0 + 00
Approximate Linear Feet 170
PiDe Diameter 6"
Required Time 2:50
Starting Time *
Initial Pressure * psi.
Passed X
*
Comments Note:
to
Sra. 1 + 70
Actual Time
Finishing Time
Final Pressure
psi ·
Failed
Pierce-Linsford Associat-~-~- was not present during
the ~stin~ ~f this line. Paul Lusk with Ginn Inc. ,:observed and passed this _
P'ro J e~ft- Observer