Loading...
Sherwood Park 2-LR 841115PROJECT OBSERVATION R~ORT JOB NUMBER 153.25 JOB TITLE CONTRACTOR M. Co. Construction PIERCE-LUNSFORD ASSOCIATES, INC. Sherwood Park II DATE 11-15-84 LOCATION Co~uell WORK PERFORMED THIS DATE Contractor was able to pass all mandrill test, except the 6" sanitary line '~". Contractor was not able to force the mandrill in through the 6" ~i~e located in the existing manhole of 0 + 00 line "m" mandrill sto~ed at about 2' - 0 into the line. A visual inspection of the pi~e showed no obstructions. Contractor was advised special attention would be payed to tb~ air tests of this line. Mandrill _ could not be entered into the line at the east end due to the clean out bend. An inspection of tb~ 48" storm pipe line "B" was made. Contractor was a~tvised to remove all debris and repair one broken spikot on the south wall approximately 1/3 East of West End. Contractor expressed concern about joints in radius along north wall line "B". A visual inspection showed no probl~. _ REMARKS OFFICIAL VISITORS WEATHER Clear HOURS WORKED ON JOB TEMPERATURE 7--00 SIGNATURE