Sherwood Park 2-LR 841108JOB NUMBER
CONTRACTOR
LOCATION
PROJECT OBSERVATION REk~3RT
153.25 JOB TITLE
WORK PERFORMED THIS DATE
PIERCE-LUNSFORD ASSOCIATES, INC.
Park II DATE ._~
Onntrac~nr la_vita_ s~n~m sawer al rng 18" lateral of 1
.- ~ted cc~plet~ wa~r systmm (final) tbi-~ dat~ and _D~.~d.
REMARKS
OFFICIAL VISITORS ON JOB
WEATHER
HOURS WORKED
SIGNATURE
TEMPERATURE
TO
pIE& E-LUNSFORD ASS _ICIATES, INC.
CONSULTING ENGINEEI::IS
UTILITY LINE
INSPECTION AND TESTING
Client
Coppell M. U. D. # 1
Reference: 153.25
Project: S~Park II
Contractor M. Co. Construction
Date: 11-8-84
Diameter: 8" and 6"
Area: Main $ Servi¢9~ Line:
8" 2525
Length: 6" 140 Plan Sheet No:
PRESSURE TEST
START
Time: 10:50 a.m.
Pressure: 180
Allowable Leakage Per Day:
FINISH
Time: 1:05 extmnd~d to 2:0~
Pressure: 180 Dsi.
(11.65 gpd) x
.49 8
(.03miles of pipe) x ( ~ inch Diameter) -
Gallons Lost Per Day:
( 4.05
Passed:
COMMENTS:
Gal. Lost) + (2% Hrs. Tested) X 24 Hrs.
X Rejected:
45.67
2.10
47.77
43.2
INFILTRATION/EXFILTRATION TEST
START
Time:
Time:
Allowable Leakage Per Dav:
(200 gpd) X ( miles of pipe) X (
Gallons Lost Per Day:
( Gal. Lost) + (
Passed:
COMMENTS:
FINISH
inch Diameter)
Hrs. Tested) X 24 Hrs. =
Rejected
Tested Performed By:
Passed or Rejected By: