Loading...
Sherwood Park 2-LR 841108JOB NUMBER CONTRACTOR LOCATION PROJECT OBSERVATION REk~3RT 153.25 JOB TITLE WORK PERFORMED THIS DATE PIERCE-LUNSFORD ASSOCIATES, INC. Park II DATE ._~ Onntrac~nr la_vita_ s~n~m sawer al rng 18" lateral of 1 .- ~ted cc~plet~ wa~r systmm (final) tbi-~ dat~ and _D~.~d. REMARKS OFFICIAL VISITORS ON JOB WEATHER HOURS WORKED SIGNATURE TEMPERATURE TO pIE& E-LUNSFORD ASS _ICIATES, INC. CONSULTING ENGINEEI::IS UTILITY LINE INSPECTION AND TESTING Client Coppell M. U. D. # 1 Reference: 153.25 Project: S~Park II Contractor M. Co. Construction Date: 11-8-84 Diameter: 8" and 6" Area: Main $ Servi¢9~ Line: 8" 2525 Length: 6" 140 Plan Sheet No: PRESSURE TEST START Time: 10:50 a.m. Pressure: 180 Allowable Leakage Per Day: FINISH Time: 1:05 extmnd~d to 2:0~ Pressure: 180 Dsi. (11.65 gpd) x .49 8 (.03miles of pipe) x ( ~ inch Diameter) - Gallons Lost Per Day: ( 4.05 Passed: COMMENTS: Gal. Lost) + (2% Hrs. Tested) X 24 Hrs. X Rejected: 45.67 2.10 47.77 43.2 INFILTRATION/EXFILTRATION TEST START Time: Time: Allowable Leakage Per Dav: (200 gpd) X ( miles of pipe) X ( Gallons Lost Per Day: ( Gal. Lost) + ( Passed: COMMENTS: FINISH inch Diameter) Hrs. Tested) X 24 Hrs. = Rejected Tested Performed By: Passed or Rejected By: