Loading...
Solomon Dental-CS 980716 Coppell Texas 75019 //---~/~ The City With A Beautiful Future 972-462-0022 July 16, 1998 Michael Lease Structures and Interiors, Inc. /~.n~ ~ 2855 Exchange Blvd., Suite 300 Southlake, TX 76092 RE: Soloman Dental Building Development Fee Assessment Dear Mr. Lease: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell ia the amount of $3,730.49 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward :e, working with you on this project. If you have any questions, please contact me. at'tin, P.E. Assistant City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENTFEETABLE Project: Soloman Dental Building Date: 7/16/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $2,250.00 $2,250.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $57.75 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $57.75 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $1,125.00 $1, ! 25.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee II $50.00 (100 % due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $355.49 $355.49 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Projec available at this time Street Sign Fee Information not (100% due prior to Acceptance of Projec available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $4,110.99 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $3,730.49 DEVELOPMENT FEE WORKSHEET PROJECT: Sol#man Dental Building DATE: 7/16/98 Water Impact Fee: Domestic Meter(s): 1 - 1 inch = 2.5 ESU's Irrigation Meter(s): I - 1 inch = 2.5 ESU's = ESU's Fireline Meter(s): = ESU's Total #: 5 ESU's @ $450.00 ea. $2,250.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. $100.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $57.75 $57.75 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $57.75 $57.75 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: I Meter(s) @ $35.00 ea. $35.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 2.5 @ $450.00 ea. $1,125.00 Wastewater Tap Inspection Fee: Total 0: I Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Page 1 tJEVELOPMENT FEE WORKSH 2ET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A Single-family @ $1285.00 / Lot N/A N/A Multi-family @ $1285.00 / Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $355.49 Street Lighting Fees: Information not Assessed for lighting in the City's right-of-way, available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information not Assessed for signage in the City's right-of-way, available at this time (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 .. ROADWAY IMPACT FEE CALCULATIONS PROJECT: Soloman Dental Building DATE: 7/16/98 ROADWAY IMPACT FEE: Service Area * 1 Category ** Office Land Use ** General Office Building Building Size (Sq. Ft.) 2,815 Development Units ** 2.815 Vehicle Miles per Development Unit ** 3.99 Fee per Vehicle Mile *** $300 Roadway Impact Fe~ue = (Development Units) ~ (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $3,369.56 · (Figure 2 - Roadway Impact Fee Study) · * (Table 3 - Roadway Impact Fee Study) · ** (Schedule 2, Page 3 - Roadway Impact Fee Study) As per the 1980 Univest agreement this property can not be assessed for Denton Tap Rd. & Sandy Lake Rd. Therefore a percentage was calculated by subtracting out the total cost in service area I for all projects concerning Denton Tap Rd. & Sandy Lake Rd. and divide the Amount of Reduction remainder by the total cost of all the projects in the service area. The calculated percentage $3,014.07 is 10.55. AMOUNTDUE: $355.49 I