Solomon Dental-CS 980716 Coppell Texas 75019
//---~/~ The City With A Beautiful Future 972-462-0022
July 16, 1998
Michael Lease
Structures and Interiors, Inc. /~.n~ ~
2855 Exchange Blvd., Suite 300
Southlake, TX 76092
RE: Soloman Dental Building
Development Fee Assessment
Dear Mr. Lease:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell ia the amount of $3,730.49 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
:e, working with you on this project. If you have any questions, please contact me.
at'tin, P.E.
Assistant City Engineer
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENTFEETABLE
Project: Soloman Dental Building
Date: 7/16/98
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $2,250.00 $2,250.00
(100 % due prior to Council Approval)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $57.75
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $57.75
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $1,125.00 $1, ! 25.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee II $50.00
(100 % due at Issuance of Building Permit)
Park Fee $0.00 N/A
(100% due prior to Council Approval)
Roadway Impact Fee $355.49 $355.49
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Projec available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Projec available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $4,110.99
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $3,730.49
DEVELOPMENT FEE WORKSHEET
PROJECT: Sol#man Dental Building
DATE: 7/16/98
Water Impact Fee:
Domestic Meter(s): 1 - 1 inch = 2.5 ESU's
Irrigation Meter(s): I - 1 inch = 2.5 ESU's
= ESU's
Fireline Meter(s): = ESU's
Total #: 5 ESU's @ $450.00 ea. $2,250.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea. $100.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $57.75 $57.75
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $57.75 $57.75
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: I Meter(s) @ $35.00 ea. $35.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea. $30.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU' 2.5 @ $450.00 ea. $1,125.00
Wastewater Tap Inspection Fee:
Total 0: I Connections @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Page 1
tJEVELOPMENT FEE WORKSH 2ET
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A Single-family @ $150.00 / Lot N/A
N/A Multi-family @ $75.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A Single-family @ $350.00 / Lot N/A
N/A Multi-family @ $350.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A Single-family @ $1285.00 / Lot N/A
N/A Multi-family @ $1285.00 / Unit N/A
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations) $355.49
Street Lighting Fees: Information not
Assessed for lighting in the City's right-of-way, available at this time
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees: Information not
Assessed for signage in the City's right-of-way, available at this time
(See attached fee calculations if applicable)
Construction Inspection Fees: Need submittal of
A copy of the development contract must be submitted for assessment, development contracts
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
.. ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Soloman Dental Building
DATE: 7/16/98
ROADWAY IMPACT FEE:
Service Area * 1
Category ** Office
Land Use ** General Office Building
Building Size (Sq. Ft.) 2,815
Development Units ** 2.815
Vehicle Miles per Development Unit ** 3.99
Fee per Vehicle Mile *** $300
Roadway Impact Fe~ue = (Development Units) ~
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $3,369.56
· (Figure 2 - Roadway Impact Fee Study)
· * (Table 3 - Roadway Impact Fee Study)
· ** (Schedule 2, Page 3 - Roadway Impact Fee Study)
As per the 1980 Univest agreement this property can not be assessed for Denton Tap Rd. &
Sandy Lake Rd. Therefore a percentage was calculated by subtracting out the total cost in
service area I for all projects concerning Denton Tap Rd. & Sandy Lake Rd. and divide the Amount of Reduction
remainder by the total cost of all the projects in the service area. The calculated percentage $3,014.07
is 10.55.
AMOUNTDUE: $355.49 I