Loading...
Sonic Addition-LR 940816 G~O- CONSULTING ENGINEERS IN: TB(:~[H~QUR~ .nvi ronmenta[ Assessments ~. Soits & Foundations Construction Hateria[s Testing "Excet[encebyExperience" Commercial & Industrial Inspection PO Box 92548 · South[ake, Texas 76092 · (817) 329-0281 FIELD COMPACTION REPORT PROJECT: The Sonic Addition LOCATION: Coppell JOB #: 94-1171 DATE: 08-16-94 DAY: Tuesday TIME: 10:30am CLIENT: Legend Construction CONTRACTOR: Dal-Texcon WATER DRY PER- TEST PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP South Entrance: 1. Northside @ Sta 0+50 FG 2 13.2 98.4 98.2 2. Northside @ Sta 1+00 FG 2 14.2 97.1 96.9 3. Northside @ Sta 1+50 FG 2 13.5 96.9 96.7 REMARKS: All tests passed. Minimum Compaction Required: 95% FG = Final Grade Minimum of 4 tests per trip PROCTORS: 1. Reddish Brown Sandy Clay 110.7 PCF @ 16.3% MOISTURE 2. Tan & Light Gray Fine Sand w/ Clay 100.2 PCF @ 12.0% MOISTURE Jeffrey Holden Technician