Loading...
Sonic Addition-LR 940708T~Z~l~Be .vi ronmenta[ Assessments ~ soils & Foundations Construction Hateria[s Testing ,,Excettence by Experience" Commercia[ & Industrial Inspection PO Box 92548 * Southtake, Texas 76092 · (817) 329-0281 FIELD COMPACTION REPORT PROJECT: The Sonic Addition LOCATION: Coppell JOB #: 94-1171 DATE: 07-08-94 DAY: Friday TIME: 12 noon CLIENT: Legend Construction CONTRACTOR: Legend Construction WATER DRY PER- TEST PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP 8" Water Line: 1. 50' west of Denton Tap 3rd Lift 1 19.2 107.4 97.0 2. 10' off fire hydrant FG 1 18.9 105.4 95.2 3. 15' off fire hudrant 3rd Lift 1 18.1 107.8 97.3 REMARKS: Ail tests passed. Minimum Compaction Required: 95% Minimum of 4 tests per trip. FG = Final Grade PROCTORS: 1. Reddissh Brown Sandy Clay 110.7 PCF @ 16.3% MOISTURE Jeff Holden Technician