Sonic Addition-LR 940705 tl~1)-- CON-LTING ENGINEERS IN~
T~ZQU~. L,lvironmenta[ Assessments
~. Soits & Foundations
Construction Hateria[s Testing
"Exce[tence by Experience" Commercial & Industrial Inspection
PO Box 92548 · South[ake. Texas ?6092 · (817) ]29-0281
FIELD COMPACTION REPORT
PROJECT: The Sonic Addition LOCATION: Coppell
JOB #: 94-1171 DATE: 07-05-94 DAY: Tuesday TIME: 3:15pm
CLIENT: Legend Construction CONTRACTOR: Legend Construction
WATER DRY PER-
TEST PROCTOR CONT. DEN CENT
NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP
Water Main: 1. 100 N Denton Tap FG 2 12.8 97.5 97.3
2. 50' north of Test #1 FG 2 12.2 96.9 96.7
REMARKS:
Ail tests passed.
Minimum Compaction Required: 95%
Minimum of 4 tests per trip.
FG = Final Grade
PROCTORS:
2. Tan & Light Gray Fine Sand w/ Clay 100.2 PCF @ 12.0% MOISTURE
Patrick Corbett
Technician