Loading...
Sonic Addition-LR 940705 tl~1)-- CON-LTING ENGINEERS IN~ T~ZQU~. L,lvironmenta[ Assessments ~. Soits & Foundations Construction Hateria[s Testing "Exce[tence by Experience" Commercial & Industrial Inspection PO Box 92548 · South[ake. Texas ?6092 · (817) ]29-0281 FIELD COMPACTION REPORT PROJECT: The Sonic Addition LOCATION: Coppell JOB #: 94-1171 DATE: 07-05-94 DAY: Tuesday TIME: 3:15pm CLIENT: Legend Construction CONTRACTOR: Legend Construction WATER DRY PER- TEST PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP Water Main: 1. 100 N Denton Tap FG 2 12.8 97.5 97.3 2. 50' north of Test #1 FG 2 12.2 96.9 96.7 REMARKS: Ail tests passed. Minimum Compaction Required: 95% Minimum of 4 tests per trip. FG = Final Grade PROCTORS: 2. Tan & Light Gray Fine Sand w/ Clay 100.2 PCF @ 12.0% MOISTURE Patrick Corbett Technician