Loading...
Shadowridge P4-CS 900307Schrickel, Rollins and Associates, Inc. Landscape Architecture · Planning · Engineering March 7, 1990 Russell R. Doyle, P.E. City Engineer P.O. Box 478 Coppell, Texas 75019 Victor W. Baxter, ASLA Kent E. Besley, ASLA Terry T. Cheek, ASLA Terry E. Cullender -- DinoJ. Ferralli, PE Daniel B. Hartman, PE Mark C. Hatchel, ASLA Hersbel [indly, APR Albert W. Rollins, PE Gene Schrickel, FASLA Larry D. Stone, PE RE: Shadow Ridge Estates 4th Increment / 30" RCP Dear Mr. Doyle, I have discussed your letter dated Feb. 21, 1990 with Centex Real Estate and they intend to purse the extended maintenance bond option offered in your letter. Shown below are estimated cost for removing and replacing concrete alley pavement, removing and replacing concrete flume and headwall, excavating existing 30" RCP, installing 30" RCP on grade and mechanically tamping backfill material. These figures are provided for assistance in determining the maintenance bond amount. Remove 240 sq. ft. of concrete .......... $ 300.00 Replace 240 sq. ft. of concrete .......... $1000.00 Remove and replace 30" RCP TOTAL ESTIMATED COST .......... $1200.00 $2500.00 Yours Truly, SCHRICKEL, ROLLINS AND ASSOCIATES, INC. Sanford P. LaHue, Jr., P.E. SPL/ws3 cc Steve Stolte, Centex 1161 Corporate Drive West · Suite 200 · Arlington, Texas 76006 · 1817) 649.3216/Metro 640-8212/FAX (8171 649-7645