Loading...
Shadowridge P4-CS 880609Street Lisht Assessment The following assessment is being made in accordance with the City of Coppell. Subdivision Ordinance ApPendix A Chapter VI, D. The following figures were supplied by T.P. & L. for estimating this assessment. $292.60 per light for every 200 feet of roadway. You are being assessed for to ~ lights. ft. of roadway, which totals $292.60 x 3 lights = ~7,60 *Before lights are installed contact Public Works - Steve Goram, Director of Public Works or Per Birdsall, Street Foreman to have lighting plan approved. STREET SIGN ASSESSMENT f or The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based o~ current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE 2. ~ ;:z'~ .o~ No Parking $53.10 Speed Limit $63.54 Yield $58.56 Stop $65.12 Street Name $11.60 Stop & Street Combo $96.85 OTHER TOTAL ~ ~ ~7.0 _~ * Cost breakdowns may be obtained from Public Works by written request.