Loading...
Sonic Addition-CS 940915 COPPELL PUBLIC WORKS MEMORAN'DUM DATE: September 15, 1994 TO: Larry Davis, Construction Inspector FROM: Rey Gonzales, Street Superintendent ~ RE: Walk Through - Sonic Street personnel performed a walk through at the above referenced project. Below is a list of items that are deficient: 1. Pavers need sand - primarily in north drive. 2. Seal around valve stack block outs. 3. Two of seven jiggle bars broken. 4. Shrinkage cracks in 2nd & 3rd panel south t¥om median opening. 5. Top coat put on concrete median nose. 6. Crack running along saw joint to midway on street. If you have any questions, please advise. WALKTHRU.HLP.TOSONIC.RG