Sonic Addition-CS 940608 '
June 8, 1994
Mr. Bill Anderson
Dowdey, Anderson and Associates, Inc.
16250 Dallas Parkway
Suite 100
Dallas, TX 75248
RE: Sonic Addition
Revised Development Fee Assessment
Dear Mr. Anderson:
Enclosed is a copy of the revised City of Coppell Development Fee Assessment list, along with
a copy of the Development Fee Calculations for Sonic Addition.
The amount of $2,725.00 has previously been paid but, because of the change in the domestic
water meter size an additional amount of $1,650 needs to be paid. Please provide a check made
payable to the City of Coppell in the amount of $1,650 and forward it to Mr. Alan Johnson,
Finance Director, along with a copy of the Fee Assessment List. Please provide our office a
copy of the Engineer's Estimate or contract for this project so the construction inspection fee
can be verified.
By providing a copy of your paid receipt to our office, it will help us to verify payment of the
required fees and insure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do not
hesitate to contact me.
Sincerely, ,,
Michael A. Martin, E.I.T.
cc: Steve Goram, Director of Public Works
Alan Johnson, Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
CITY OF COPPELL
DEVELOPMENT FEES
Date: Revised June 8,1994
Project: Sonic Addition
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $ 3,250.00 $ 3,250.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $ 200.00 -0-
(100% due at Issuance of Building Permit)
Wastewater Impact Fee $1,125.00 $ l, 125.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee -0- -0-
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $ 50.00 -0-
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) $ 46.10 -0-
(100% due at Issuance of Building Permit)
Water Meter Deposit (Non-residential) $ 35.00 -0-
(100% due at Issuance of Building Permit)
Water Meter Fee (Irrigation & Fire) $ 46.10 -0-
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit $35.00 -0-
(100% due at Issuance of Water Meters)
Street Sign Fee -0- -0-
(100% due prior to Acceptance of Project)
Street Light Fee * information not -0-
(100% due prior to Acceptance of Project) available
Park Fee -0- -0-
(50% due prior to Council Approval) (50% = )
(50% due prior to Issuance of Building Permit) (50% = )
Construction Inspection Fee need submittal of -0-
(2~c of Project Cost due prior to Preconst. Mtg.) contracts
TOTAL $ 4,787.20
I '
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 4,375.00
· This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.
COPPELL PUBLIC WORKS
MEMORANDUM
DATE: June 3, 1994
TO: Engineering Depart~[~n,t
FROM: Public Works Staff~
RE: Development Fees for Sonic Addition - Revised
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
1 - 1" Domestic Meter/s = 2.5 ESU's
1 - 1" Irrigation Meter/s = 2.5 ESU's
- Fireline Meter/s = ESU's
Total 5 ESU's @ $650.00 ea = $ 3,250.00
100% due prior to Council approval of the final plat.
Wastewater Impact (City)
1 - 1" Domestic Meter/s = 2.5 ESU's
Total 2.5 ESU's @ $450.00 ea = $ 1,125.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
2 Connections @ $100.00 each = $ 200.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
Connections @ $100.00 each = $
100% due prior to issuance of building permit. (Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
1 lots @ 550.00/lot = 5 50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1 - 1" Domestic Meters @ 546.10 ea = S 46.10
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
1 - 1" Irrigation Meter/s ~ S 46.10 ea = 5 46.10
- Fireline Meter/s ~ $ ea = 5
100% due prior to issuance of water meter/s.
Water Meter Deposit (Residential)
Meters @ 530.00 ea = 5
100% due prior to issuance of building permit.
Water Meter Deposit (Multi-Family or Non-Residential)
1 Meters ~ 555.00 ea = S 35.00
100% due prior to issuance of water meters.
Irrigation Meter Deposit
1 Meters ~ $35.00 ea = S 35.00
100% due prior to issuance of water meters.