Loading...
Sonic Addition-CS 940510 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 May 10, 1994 Mr. Bill Anderson Dowdey, Anderson and Associates, Inc. 16250 Dallas Parkway Suite 100 Dallas, TX 75248 RE: Sonic Addition Development Fee Assessment Dear Mr. Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Sonic Addition. Please provide a check made payable to the City of Coppell in the amount of $2,725.00 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do n,~}AT hesitate to contact me. Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer cc: Steve Goram, Director of Public Works C DS Alan Johnson, Acting Finance Director Greg Jones, Building Official e~ --- Doug Stevens, Engineering Technician ~ D C CITY OF COPPELL DEVELOPMENT FEES Date: May 10,1994 Project: Sonic Addition TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $ 2,275.00 $ 2,275.00 (100% due prior to Council Approval) Water Tap Inspection Fee $ 200.00 -0- (100% due at Issuance of Building Permi0 Wastewater Impact Fee $ 450.00 $ 450.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee -0- -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee $ 50.00 -0- 000% due at Issuance of Building Permit) Water Meter Fee (Domestic) $ 22.25 -0- (100% due at Issuance of Building Permit) Water Meter Deposit (Non-residential) $ 70.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) $ 46.10 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit -0- -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Park Fee -0- -0- (50% due prior to Council Approval) (50% = ) (50% due prior to Issuance of Building Permit) (50% = ) Construction Inspection Fee need submittal of -0- (2% of Project Cost due prior to Preconst. Mtg.) contracts TOTAL $ 3,113.35 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 2,725.00 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL PUBLIC WORKS MEMORANDUM DATE: April 22, 1994 TO: Engineering Department FROM: Public Works Staff RE: Development Fees for Sonic Addition The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 1 - 5/8" x 3/4" Domestic Meter/s = 1 ESU's 1 - 1" Irrigation Meter/s = 2.5 ESU's - Fireline Meter/s = ESU's Total 3.5 ESU's @ $650.00 ea = $ 2,275.00 100% due prior to Council approval of the final plat. Wastewater Impact (City) 1 - 5/8" x 3/4" Domestic Meter/s = 1 ESU's Total 1 ESU's ~ $450.00 ea = $ 450.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 2 Connections @ $100.00 each = $ 200.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, f~ is due prior to issuance of meter). Sewer Tap Inspection Fee Connections ~ $100.00 each = $ 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots ~ $50.00/iot = $ 50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - 5/8" x 3/4" Domestic Meters ~ 22.25 ea = $ 22.25 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 1" Irrigation Meter/s ~ $ 46.10 ea = $ 46.10 - Fireline Meter/s 100% due prior to issuance of water meter/s. Water Meter Deposit (Residential) Meters @ $30.00 ea = S 100% due prior to issuance of building permit. Water Meter Deposit (Multi-Family or Non-Residential) 2 Meters @ $35.00 ea = $ 70.00 100% due prior to issuance of water meters. Irrigation Meter Deposit Meters @ $35.00 ea = 100% due prior to issuance of water meters.