Sonic Addition-CS 940510 Coppell, Texas 75019
The City With A Beautiful Future 214-462-0022
May 10, 1994
Mr. Bill Anderson
Dowdey, Anderson and Associates, Inc.
16250 Dallas Parkway
Suite 100
Dallas, TX 75248
RE: Sonic Addition
Development Fee Assessment
Dear Mr. Anderson:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee Calculations for Sonic Addition.
Please provide a check made payable to the City of Coppell in the amount of $2,725.00 and forward
it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment List.
Please provide our office a copy of the Engineer's Estimate or contract for this project so the
construction inspection fee can be verified.
By providing a copy of your paid receipt to our office, it will help us to verify payment of the
required fees and insure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do n,~}AT
hesitate to contact me.
Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
cc: Steve Goram, Director of Public Works C DS
Alan Johnson, Acting Finance Director
Greg Jones, Building Official e~ ---
Doug Stevens, Engineering Technician ~ D C
CITY OF COPPELL
DEVELOPMENT FEES
Date: May 10,1994
Project: Sonic Addition
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $ 2,275.00 $ 2,275.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $ 200.00 -0-
(100% due at Issuance of Building Permi0
Wastewater Impact Fee $ 450.00 $ 450.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee -0- -0-
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $ 50.00 -0-
000% due at Issuance of Building Permit)
Water Meter Fee (Domestic) $ 22.25 -0-
(100% due at Issuance of Building Permit)
Water Meter Deposit (Non-residential) $ 70.00 -0-
(100% due at Issuance of Building Permit)
Water Meter Fee (Irrigation & Fire) $ 46.10 -0-
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit -0- -0-
(100% due at Issuance of Water Meters)
Street Sign Fee -0- -0-
(100% due prior to Acceptance of Project)
Street Light Fee * information not -0-
(100% due prior to Acceptance of Project) available
Park Fee -0- -0-
(50% due prior to Council Approval) (50% = )
(50% due prior to Issuance of Building Permit) (50% = )
Construction Inspection Fee need submittal of -0-
(2% of Project Cost due prior to Preconst. Mtg.) contracts
TOTAL $ 3,113.35
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 2,725.00
* This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.
COPPELL PUBLIC WORKS
MEMORANDUM
DATE: April 22, 1994
TO: Engineering Department
FROM: Public Works Staff
RE: Development Fees for Sonic Addition
The following fees should be assessed and collected on the above
referenced project.
Water Impact Fee:
1 - 5/8" x 3/4" Domestic Meter/s = 1 ESU's
1 - 1" Irrigation Meter/s = 2.5 ESU's
- Fireline Meter/s = ESU's
Total 3.5 ESU's @ $650.00 ea = $ 2,275.00
100% due prior to Council approval of the final plat.
Wastewater Impact (City)
1 - 5/8" x 3/4" Domestic Meter/s = 1 ESU's
Total 1 ESU's ~ $450.00 ea = $ 450.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
2 Connections @ $100.00 each = $ 200.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, f~ is due
prior to issuance of meter).
Sewer Tap Inspection Fee
Connections ~ $100.00 each = $
100% due prior to issuance of building permit. (Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
1 lots ~ $50.00/iot = $ 50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1 - 5/8" x 3/4" Domestic Meters ~ 22.25 ea = $ 22.25
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
1 - 1" Irrigation Meter/s ~ $ 46.10 ea = $ 46.10
- Fireline Meter/s
100% due prior to issuance of water meter/s.
Water Meter Deposit (Residential)
Meters @ $30.00 ea = S
100% due prior to issuance of building permit.
Water Meter Deposit (Multi-Family or Non-Residential)
2 Meters @ $35.00 ea = $ 70.00
100% due prior to issuance of water meters.
Irrigation Meter Deposit
Meters @ $35.00 ea =
100% due prior to issuance of water meters.