Loading...
SC-Coppell HS-CS000524 Coppell, Texas '75019 The City With A Beautiful Future 972-462-0022 P.O. BOX 478 May 24, 2000 Damon Norman Dal-Mac Construction RE: Coppell High School (Tennis Center) Fee Assessment Letter Dear Mr. Norman: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $272.05 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount includes the cost of the irrigation meter and all associated inspection fees. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of the required fees. If you have any questions, please contact me. Sincerely, Kent M. Collins, P.E. Civil Engineer cc: Jennifer Armstrong, Finance Director Debbie Ingram, Secretary Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE WORKSHEET PROJECT: Coppell High School (Tennis Center Irr. Meter) DATE: 05/24/2000 Water Impact Fee: Domestic Meter(s): 0 = 0 ESU's Irrigation Meter(s): 1 - 2 inch = 8 ESU's 0 = 0 ESU's Fireline Meter(s): 0 = 0 ESU's Total #: 8 ESU's @ $450.00 ea. $0.00 (100% due prior to Council approval of the final plat) (ClSD Projects Exempt) Water Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $192.05 $192.05 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 0 Fireline Meter(s) @ $0.00 $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $35.00 ea. $0.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 @ $450.00 ea. $0.00 Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. $0.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. $0.00 (100% due prior to issuance of building permit) Page 1 DEVELOPMENT FEE TABLE Project: Coppell High School (Tennis Center lrr. Meter) Date: 05/24/2000 TOTAL FEES DUE Water Impact Fee $0.00 (100% due prior to Council Approval) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $192.05 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 (100 % due prior to Council Approval) Roadway Impact Fee $0.00 (100 % due prior to Council Approval) Street Light Fee Information not Ava (100% due prior to Acceptance of Project Street Sign Fee Information not Ava (100% due prior to Acceptance of Project Construction Inspection Fee Information not Ava TOTAL $272.05