Loading...
SC-Coppell HS-CS010501 T H E ¢ I T Y O F CO?PEI £ A $ . May 1, 2001 Dalmac Construction 111 West Spring Valley Rd. P.O. Box 830160 Richardson, TX 75083-0160 RE: Coppell High School Final Acceptance Dear Mr. Ivy: A final inspection of Water, Sanitary Sewer and Utilities for the referenced project has been confu'med by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Construction Inspector cc: Ken Griffin, Director of Engineering/Public Works Rhonda Brothers, Engineering Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Lee Stone, Commercial Building Inspector Travis Crump, Fire Marshal